Top-rated excavation pros.

Best excavation pros near Bernville, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Bernville, PA?

Select your specific project to find the pro for you.

Top-Rated Excavation pros in Bernville - Updated Nov 2026

Avatar for Northwestern Property Maintenance, LLC
Northwestern Property Maintenance, LLC
5.0(
9
)
Building Site - Preparation and ClearingExcavation - Major Grading or Resloping - For Business

Serving Bernville, PA and surrounding areas

Approved

In business since 2020

Free estimates

Offers commercial services

"Josh at Northwestern was very reliable and installed my block retaining wall and related landscaping including stone top soil plants shrubs resulting in a quality finished product. And the best part is that there was no resulting damage to my driveway and lawn when using the mini-excavator because Josh took the necessary precautions. I am very pleased. I highly recommend Northwestern!"
Lawn Care
Lawn Care
Lawn Care
Lawn Care
Lawn Care

+8

4 neighbors recently requested a quote
Creek View Construction, LLC
5.0(
1
)
Building Site - Preparation and Clearing

Serving Bernville, PA and surrounding areas

Approved

In business since 2005

Free estimates

Credit card accepted

We are owner operated, and believe in building long-term relationships with our clients by delivering honesty along with exceptional work. We pride our company on reliability, great communication, integrity, and customer service. We are experts in our trade and will do our best to keep you as educated as we can on your particular project. We work for our customers on their schedule, as to make it as convenient as possible for you! We look forward to working with you!

Response time12 hrs
Avatar for J Donisch Contracting LLC
J Donisch Contracting LLC
New to Angi
Landscape - Minor Grading or ReslopingBuilding Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For Business+1 more

Serving Bernville, PA and surrounding areas

Approved

In business since 2023

Free estimates

Emergency services offered

J Donisch Contracting LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

1 neighbors recently requested a quote
...
Showing 1-10 of 92
Excavating FAQs, answered by experts

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The average cost of excavation is approximately $3,200, with typical projects ranging from $500 to $15,000. Depending on the contractor, you may be charged between $50 and $200 per cubic yard or an hourly rate of $40 to $180 for an excavation specialist. The total cost is influenced by several factors, including the project size, the amount of soil to be removed, and the soil's condition. Hard soil, tree roots, or excessive rocks and clay can increase the price, potentially adding $200 to $1,200 to the final bill. Other factors that can drive up costs include the presence of nearby structures that complicate the work or tight spaces that require manual excavation instead of heavy machinery.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Some two-in-one tools and machines do both jobs, and those could be the right solution for smaller residential projects. However, the phrase “use the right tool for the job” definitely applies to digging. For the best results, get two separate tools for your trenching and landscape edging projects or call a pro to take care of everything for you.

The Bernville, PA homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.