Top-rated subcontractors.

Get matched with top subcontractors in Athens, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Athens, PA?

Select your specific project to find the pro for you.

TRUSTED BY ATHENS, PA HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon90
    Verified subcontracting services reviews

Find Subcontractors in Athens

Avatar for Central Lending Svc Inc dba Credit Central
Central Lending Svc Inc dba Credit Central
4.8(
72
)
Major Home Repairs (General Contractor)

Serving Athens, PA and surrounding areas

In business since 2003

Emergency services offered

"Since we are looking in to buy in Ohio, Mark could not work with us due to not being licensed there.  He was very helpful and spent several minutes on the phone answering questions and helping me understand a couple different unconventional loans.
"
Additional Photos
Recommended by100%of homeowners
Avatar for Rock-A-Fellas Co Inc
Rock-A-Fellas Co Inc
4.5(
23
)
Major Home Repairs (General Contractor)

Serving Athens, PA and surrounding areas

In business since 2003

Credit card accepted

"Once the job was completed, it looked like the fence was never there!  We were very impressed with the quality of the work, the price, as well as the ease of doing business with Rock-A-Fellas.  We will be using them for some other much needed home projects!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by100%of homeowners
Avatar for Eco Builder Services Co
Eco Builder Services Co
3.9(
46
)
Major Home Repairs (General Contractor)

Serving Athens, PA and surrounding areas

In business since 2006

Free estimates

Emergency services offered

"The estimate was provided the same day they came to look at the roof.  The estimate was detailed and easy to read.  Gino kept me informed of all the steps and the work was completed on time.  Very professional.
"
Recommended by64%of homeowners
Showing 1-10 of 36
Subcontractors questions, answered by experts

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

Structural engineers draw structural plans, which include detailed drawings of the structural components of a home only. Complete house plans will require additional work from an architect or draftsperson, whose drawings will take the structural drawings into account. They’ll also include more details about the finishing materials and layout of a home, including everything from roofing and flooring materials to the position of furniture, light fixtures, switches, and plumbing fixtures.

Builder-grade is one of two types of stock cabinets, whereas semi-custom designs allow homeowners some control over the color, finish, or hardware on their cabinets. Stock cabinets are sold in construction-grade and builder-grade designs. Construction-grade cabinets are usually made from inexpensive medium-density fiberboard, which is prone to moisture damage, whereas builder-grade models are a step up with higher-quality materials. Construction-grade designs are the most common type of cabinets in America.

A floor plan is a less detailed illustration showing a building or room's layout from above, including elements like windows, doors, walls, and fixtures. It offers a simplified view for homeowners. In contrast, a blueprint is a more detailed, to-scale architectural drawing that includes all parts of the building plans, such as structural elements, construction details, and utility schematics. While a floor plan can be a type of view within a blueprint, the complete blueprint contains all the necessary details to turn the plan into a reality.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

The Athens, PA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.