Top-rated basement remodelers.

Get matched with top basement remodelers in Colton, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Colton, OR?

Select your specific project to find the pro for you.

Find Basement remodelers in Colton

Avatar for Toro Framing and Remodeling
Toro Framing and Remodeling
4.6(
16
)
Basement - Remodel

Serving Colton, OR and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"I was looking to get some tilling done in my kitchen when I came across Toro Framing and Remodeling. They were very efficient and great customer service. I was satisfied with how great their work was, will definitely be contacting them in the future for any other remodeling I need done. Good Job ??"
Extended patio
Concrete Driveways Project
Concrete - Pouring & Repair Project
General Remodeling Project
Concrete Driveways Project

+11

Response time10 hrs
Response rate100%
Recommended by75%of homeowners
Avatar for Madsen Construction
Madsen Construction
5.0(
7
)
Basement - Remodel

Serving Colton, OR and surrounding areas

Approved

Free estimates

Credit card accepted

We pride ourselves on our extreme professionalism and attention to detail. Our customer satisfaction guarantee will assure you we will not leave your property until you are completely satisfied with our work. As a locally owned and operated business you can trust that we will treat your home as we would treat our own. Give us a call today, and we look forward to working with you!

Decorative fence
Decorative fence
Decorative fence
Business details
Business details

+3

2 neighbors recently requested a quote
Avatar for TIMBERLINE CONSTRUCTION CONCEPTS LLC
TIMBERLINE CONSTRUCTION CONCEPTS LLC
5.0(
13
)
Basement - Remodel

Serving Colton, OR and surrounding areas

Approved

In business since 2022

Free estimates

"This company did an outstanding job with our remodel project. Their team handled everything from planning to execution with professionalism and attention to detail. The workmanship especially the framing and finish work was solid, and they kept the site clean throughout the project. Communication was consistent, and any concerns were addressed right away. We’re extremely happy with the results and would work with them again."
Kitchen remodel
Kitchen remodel
Kitchen remodel
Kitchen remodel
Kitchen remodel

+2

Response time3 hrs
Response rate100%
1 neighbors recently requested a quote
Avatar for Elm Construction Services, Inc.
Elm Construction Services, Inc.
4.3(
32
)
Basement - Remodel

Serving Colton, OR and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"We recently completed a full kitchen renovation, and we couldn't be happier with the results. From start to finish, the process was seamless, professional, and delivered exactly what we envisioned. A huge part of this success goes to Tommy, our project manager. From day one, Tommy was incredibly organized, communicative, and detail-oriented. He kept the entire crew on schedule, managed every moving part with ease, and was always available to answer our questions or provide expert advice. Thank you very much."
GAF Roof Installation
GAF Roof Installation
GAF Roof Installation
GAF Roof Installation
GAF Roof Installation

+27

Response time5 hrs
Response rate99%
759 neighbors recently requested a quote
Avatar for The Renovation Company
The Renovation Company
4.5(
73
)
Basement - Remodel

Serving Colton, OR and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"I have lived in this house for 25 years, and the only project I truly feared was siding.  I have made LOTS of changes to the property  over time, but always stopped short of siding.  This was a scary project, but I signed-up because of Fine Finish Remodeling's reputation on Angie's list, etc.   Also, the siding REALLY needed to be replaced -- in some areas, it was practically held together by paint.  Other exterior improvements (roof, front door and garage door) were being done by other contractors, during the same time period.

-- Mark Stevens is owner / contractor of Fine Finish Remodeling.  He did an excellent job of communicating and moving this project along, and referring out to others as needed.  The supervisor,  Kevin Dunsworth was great, and the house shows that. 

-- Delays happened, because they do.  The contractor had some issues. The weather was sometimes lousy.  PARR lumber delivered some of the materials to somewhere else, which stopped work for about a week.  Holidays happened. People had illnesses.   Siding work stopped while  the roof was repaired and replaced (2 days).  ETC.   In general, I was impressed to watch the changes take shape.  I believe it all moved along as quickly as it could.

--I was part of the problem too.  Two different garage door companies had volunteered their opinion that I could have one BIG garage door, rather than 2 smaller doors, if I wanted to do that.  It would be no problem, according to them.  I talked to Mark, about this, and he told me what could happen if the garage door men were wrong, and recommended I consult a  structural engineer first.  He gave me a name; I called; and the short version is a huge new beam was needed.  It took 6 men to lift that into place.  The final garage door outcome is perfect. Many thanks to Mark for coordinating the extra work my super-sized garage door required.

--Logistically, the siding was removed and replaced from sides and back of house first, leaving the street appearance somewhat intact until the end.  Hardie Plank siding comes with color, but the trim is just primed, so my family did a lot of painting in our garage, and other locations.  Kevin was kind enough to give warning when there was trim to paint for an inside angle, since that would have been nasty to do after it was installed.  I had one area outside the master bedroom that had always looked strange, for the way the old trim and siding met under the eaves.  I pointed that out, and Kevin fixed it with the new trim and siding. 

--When the house was finished, it was slightly wider than it used to be, sufficiently that the downspouts no longer fit. Mark gave me the names of area gutter companies, and the first one came right out and made new downspouts and cleaned the gutters too for a great price.

--The house exterior is done, and it looks great-- and the street noises are much quieter, and odd drafts are gone.  My scary project turned out to be a good experience with a happy outcome."
Recommended by89%of homeowners
Avatar for Luxe Renovations
Luxe Renovations
4.4(
214
)
Basement - Remodel

Serving Colton, OR and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"I bought their contractor for a day at $300.00 which seemed like a deal. The thought was an online video indicated that the project could be done in one day by an inexperienced person. I met with the owner and we agreed that maybe it would take two of his experienced experts An entire day (so $600). We had challenges right in the beginning. There was an electricity outage in the neighborhood that slowed work as they could not use their saws or drills, then the two guys spent a long time arguing about how to do it, then the first four hours were up and one guy left and the other guy diligently stuck around to make up for the time wasted arguing and manually sawing which I appreciated(just to back up a second I had called the owner in the morning to discuss the outage and rescheduling and we had agreed that it would be okay as the equipment had batteries). The manager and I worked out a deal to bring out the one guy for an extra day at the same rate to finish it up and I want to say that I ended up adding one more day but this was two years ago. Nice hard working guy, just slower and less efficient than others I had worked with (in his defense he cost half as much). In the end my under deck roof is okay...it has a lot of spots that leak so my level of satisfaction is not high. In the end I got the work done at $600 (or was it $900?) This was a while back. It took two days I think, maybe three. At the end of the day I paid a C price for C quality work. In retrospect I could have recruited my brother to help me do it but it would have taken us four times as long and I can’t say the quality would have been better. Honestly if I had bid the whole job itself another crew might have charged me $3,000+. So with labor and materials I paid $1,200 maybe $1,500 and it’s adequate. I did appreciate the managers flexibility in extending the special price over additional days and letting the one guy stick around to make up for the bickering and electrical outage."
Additional Photos
Additional Photos
Additional Photos
Before
After

+29

Recommended by85%of homeowners
...
Showing 1-10 of 94
Basement Remodel questions, answered by experts

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

Yes, most general contractors require an initial down payment. A reasonable deposit is typically between 10% and 25% of the total project cost, although this can vary by project size and location. This upfront payment helps the contractor cover initial costs like materials, permits, licensing, and hiring subcontractors. The remaining balance is usually billed according to a schedule outlined in your contract, often tied to project milestones or completion dates. Be cautious of contractors who ask for a large deposit of 50% or more, as this could be a red flag for a scam.

To determine if your basement walls are suitable for finishing, assess their structural integrity and moisture conditions. Look for any signs of damage, such as cracks, bowing, or excessive moisture. Ensure proper drainage and address any underlying issues before proceeding. 

Consult with a professional if you're uncertain about the structural stability or potential risks associated with finishing your basement walls.

Living in a finished basement is acceptable, but only if the space has the proper points of egress and includes smoke and carbon monoxide (CO) detectors to ensure the safety of the occupants. A good way to ensure your finished basement is suitable for use as living space is to get the basement finishing project properly permitted.

You can paint your ceiling or install a drywall ceiling if the ceiling is unfinished, as they take up less headroom than drop ceilings. 

If there are pipes in the way of ceiling installation, you can do one of two things: reroute the pipes or adjust the installation to fit, which will cost extra.

The Colton, OR homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.