Top-rated basement remodelers.

Get matched with top basement remodelers in Shady Point, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Shady Point, OK?

Select your specific project to find the pro for you.

Find Basement remodelers in Shady Point

Avatar for Cross Construction
Cross Construction
3.9(
73
)
Basement - Remodel

Serving Shady Point, OK and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"Great to work with these guys! Very professional from the start. They each perform their roles in this business very well. I would highly recommend them and would use them again."
deck
deck
deck
deck
deck

+137

Response time3 days
15 neighbors recently requested a quote
Recommended by80%of homeowners
Avatar for B & L Handyman Services
B & L Handyman Services
5.0(
6
)
Basement - Remodel

Serving Shady Point, OK and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"The job was well done and it was done in a timely manner. Two of them working and the carport was completed in less than two days. They were on time and kept us informed. We will hire them again."
Carport add on
Yard clean up
Leaf removal
Carport add on
Leaf removal

+66

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Shady Point, OK and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for MPB Construction
MPB Construction
5.0(
1
)
Basement - Remodel

Serving Shady Point, OK and surrounding areas

We specialize in all Contractor Needs, also insurance claims. We also specialize in excavation for all your soil related tasks such as site preparation, building ponds, septic, etc. We also do residential remodels and can help with flooring, sheet rock, painting, trim and so much more.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+5

Recommended by100%of homeowners
Rocky McConnell Construction
5.0(
4
)
Basement - Remodel

Serving Shady Point, OK and surrounding areas

In business since 1984

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Recommended by100%of homeowners
Avatar for A&A Remodeling Inc
A&A Remodeling Inc
4.3(
3
)
Basement - Remodel

Serving Shady Point, OK and surrounding areas

In business since 1985

Free estimates

"A&A did remove materials and installed  some new walls, ceilings and some flooring. They gave an estimate for the entire job and an approximate time line for job completion.  The cost estimate covered 1/2 or less of the remodel cost and the time for completion would have been at least 2 times longer than estimated.  A&A did not provide crews for work, but one person did most of the actual labor.  They did have a Sheetrock finishing crew that did some work, but not all the Sheetrock  finishing.  After 5 months the job was 1/2 done and there was not 1 room in the house that was completed.  Every room was started (at some level of dismantling), but nothing was completed.  We lived 2 hours away and could not monitor hours worked or days worked and  the last 2 months A&A worked for us, we believe their schedule was very erratic as far as far as working to complete our job.
  The floor tile work was done well.  The construction of a safe room was well done.  There may have been problems that caused a delay in completion, but we were never told or consulted about the discrepancy in the time estimates.  We did modify some of the details of the remodel and understood that the additions would add to the cost, but not double the cost.  Another company was hired to complete the job."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+5

Recommended by66%of homeowners
Showing 1-10 of 29
Basement Remodel questions, answered by experts

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

Joists and beams are both part of the flooring system above your basement, with the beams spanning the length of your home and getting support from vertical posts underneath, and joists usually spanning half the width of your home with no support posts underneath. The floor joists provide even support to the subflooring and flooring above, and they distribute that load to the beams. The beams then distribute that load down through the support posts to the foundation.

The cost of finishing a basement is about $18,400 on average. As you can see, the framing portion of this project costs less, because you’re essentially just dealing with laying the foundation for a finished basement. The finishing portion of the project involves a lot more intricate work and design, as well as high-end materials.

Save money on your basement finishing project by making cost-effective decisions such as minimizing structural changes and avoiding costly construction revisions. DIY simpler tasks such as painting or basic cleanup to reduce labor costs. You can also opt for energy-efficient fixtures and materials that may qualify for rebates or tax incentives.

The Shady Point, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.