Top-rated basement remodelers.

Get matched with top basement remodelers in Marlow, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Marlow, OK?

Select your specific project to find the pro for you.

Find Basement remodelers in Marlow

L and L Adventures
New to Angi
Basement - Remodel

Serving Marlow, OK and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

Hi, my name is Tommy and I'm the owner and operator of l and L Adventures. A small company formed so I can meet the needs of individuals in need of a variety of jobs completed. My service extend from small home and farm repairs and services to remodels, custom drywall finishing and textures, landscaping and planning, painting and much much more. \nTogether we can find an innovative solution to meet your needs. God provides and if we love him and one another the same we will surely make him smile. Free estimates. Call me anytime to chat about what I can do for you.

Subfloor replacement
Subfloor replacement
Subfloor replacement
Subfloor replacement
Subfloor replacement

+15

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Marlow, OK and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Urner Electric
Urner Electric
4.1(
11
)
Basement - Remodel

Serving Marlow, OK and surrounding areas

In business since 2019

Free estimates

Emergency services offered

"Andrea and Cary were excellent, professional, very kind, did the install quickly and triple checked everything for us before they were satisfied! I can’t say enough about how terrific they were! I want to personally give them a big Thank You! Sandra H"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Recommended by87%of homeowners
Showing 1-10 of 41
Basement Remodel questions, answered by experts

Although it’s not required, air ventilation in a finished basement can help improve the air quality, prevent moisture and mold issues, keep musty odors away, and also maintain the air quality throughout the rest of your home. Proper ventilation will help maintain the value of your investment in finishing your basement. Try basement ventilation methods like installing vents or a dehumidifier for best results.

You can paint your ceiling or install a drywall ceiling if the ceiling is unfinished, as they take up less headroom than drop ceilings. 

If there are pipes in the way of ceiling installation, you can do one of two things: reroute the pipes or adjust the installation to fit, which will cost extra.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Save money on your basement finishing project by making cost-effective decisions such as minimizing structural changes and avoiding costly construction revisions. DIY simpler tasks such as painting or basic cleanup to reduce labor costs. You can also opt for energy-efficient fixtures and materials that may qualify for rebates or tax incentives.

The Marlow, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.