Top-rated basement remodelers.

Best basement remodelers near Sterling, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Sterling, OK?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Sterling - Updated Nov 2026

Avatar for 1935 Construction
1935 Construction
New to Angi
Basement - Remodel

Serving Sterling, OK and surrounding areas

Approved

Free estimates

Emergency services offered

Small jobs welcome

Introducing 1935 Construction Group (1935 CG)\n\nAt 1935 Construction Group, we believe every great project starts with a vision and is brought to life through quality craftsmanship, dedication, and attention to detail.\n\nWe specialize in commercial and residential construction, renovations, remodeling, and property improvements, helping business owners, investors, and homeowners transform their spaces.\n\nFrom restaurant and bar build-outs to commercial renovations and residential improvements, our goal is to deliver reliable service, quality workmanship, and results that exceed expectations.\n\nWhether you’re launching a new business, renovating an existing property, or bringing a new development to life, 1935 CG is committed to building lasting relationships and delivering projects you can be proud of.\n\n1935 Construction Group\nBuilding Vision. Creating Value. Delivering Excellence.\n\nLet’s build something great together.

2 neighbors recently requested a quote
Avatar for Best Decision Remodeling LLC
Best Decision Remodeling LLC
4.7(
6
)
Basement - Remodel

Serving Sterling, OK and surrounding areas

In business since 2021

Free estimates

Emergency services offered

"My experience was good. The company was easy to work with. They were very flexible. The company also helped to try and find me cheap materials. They were good on trying to keep the project very low cost as much possible."
Master Bath
Master Bath
Master Bath
Master Bath
Master Bath

+46

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Sterling, OK and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 50
Basement Remodel FAQs, answered by experts

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

Adding a bathroom to your basement can increase your home value since homes with multiple bathrooms sell for more. The return on investment (ROI) for a basement bathroom is 50% to 75%. The actual return varies with your home and location. Adding a half bath to your home increases the value by 2.9% while finishing a basement increases the home value by 6.6%.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Unless you have extensive experience in construction work, remodeling a basement is best left to a professional. There are several tasks associated with this project that require exact precision, including:

  • Replacing insulation 

  • Replacing carpet or other flooring 

  • Adding heating and cooling

  • Adjusting or adding walls and doors

  • Altering or adding plumbing elements

If any of these elements is done incorrectly, it could severely impact the quality of your basement remodel and be dangerous. Changing a basement often comes with code safety requirements, like egress windows and proper ventilation. Therefore, leaving it up to a professional is often the best decision.

Living in a finished basement is acceptable, but only if the space has the proper points of egress and includes smoke and carbon monoxide (CO) detectors to ensure the safety of the occupants. A good way to ensure your finished basement is suitable for use as living space is to get the basement finishing project properly permitted.

The Sterling, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.