Top-rated basement remodelers.

Get matched with top basement remodelers in Cleora, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Cleora, OK?

Select your specific project to find the pro for you.

Find Basement remodelers in Cleora

Avatar for Fineline Construction and Handyman Services
Fineline Construction and Handyman Services
4.0(
440
)
Basement - Remodel

Serving Cleora, OK and surrounding areas

In business since 1987

Free estimates

Emergency services offered

"Two of them came out. There was a long list and we were happy to pay more, but I was not pleased when I got home. I wanted the caulking in the shower redone and they did not get to that. There is a gate in a storage thing out in the side yard and the door needed patching. I just did not like coming home. I felt like they rushed and just did not get it all done or even attempted to get it done. The price was not the issue. I just wanted those things done. With two of them here, I felt like they could have done more."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+31

Recommended by83%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Cleora, OK and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Beau the Builder
Beau the Builder
4.1(
25
)
Basement - Remodel

Serving Cleora, OK and surrounding areas

In business since 2011

Free estimates

Emergency services offered

"We needed new posts for our wood fence. He did not try to upswell us. He showed up when he said he would. He was very professional and did a great job. His quote fit our budget and his workmanship was great. I would call him again if needed and would recommend him to family and friends!"
Before/After contrast.
Northwest Corner
Face of Deck
Top of Deck
Back Corner Facing East

+2

Response time1 day
Recommended by90%of homeowners
Avatar for McClure Contracting
McClure Contracting
5.0(
3
)
Basement - Remodel

Serving Cleora, OK and surrounding areas

In business since 1985

Free estimates

Emergency services offered

"Working with Mr. McClure was a pleasure from start to finish. He did everything he said he would do and more. For my project he did some dry wall repair, ceiling texture, and some exterior roof repair work. Throughout the job he was respectful, punctual and thoughtful. He always cleaned up his work site and checked in with me regularly if he had questions. Most importantly, the quality of his work was excellent. I would have no hesitation in recommending him to anyone."
Recommended by100%of homeowners
Avatar for White River Contractors, Inc.
White River Contractors, Inc.
5.0(
3
)
Basement - Remodel

Serving Cleora, OK and surrounding areas

In business since 2017

Free estimates

Credit card accepted

With 15 years of experience the commercial contracting industry, White River Contractors, Inc is your industry expert in Fayetteville, AR. We pride ourselves on our extreme professionalism and attention to detail. Our customer satisfaction guarantee will assure that we will not leave your property until you are completely satisfied with our work. So please give us a call today, we look forward to working with you!

Response time1 day
Recommended by66%of homeowners
Showing 1-10 of 37
Basement Remodel questions, answered by experts

It’s less expensive to finish your basement than it is to build an addition to your home. The average cost to refinish a basement is $32,000 (between $7 and $23 per square foot) while building an addition to your home costs $50,325 ($80 to $210 per square foot). Depending on the size of your basement and other factors, like moving plumbing and electrical, refinishing a basement is a more cost-effective option in most cases.

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

Building a bar in the basement will likely add value to your home, although it’s unlikely that you’ll see a significant return on investment (ROI) unless you plan on using the space for you and your guests. If you think you’ll use the area frequently, though, it’s probably worth the investment, and you should see a bump in value if or when you sell your property.

If you have the woodworking experience to build a bar from scratch and you have the time, DIYing the work is a no-brainer and can save a few thousand dollars. However, if you’re looking to include a sink, additional lighting fixtures, or high-end bar tops and cabinets, it’s usually a better idea to call in a pro. It will cost more, but the finished product will likely be worth it.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Cleora, OK homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.