Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Oriskany, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Oriskany, NY?

Select your specific project to find the pro for you.

TRUSTED BY ORISKANY, NY HOMEOWNERS

  • Average homeowner rating star icon3.9
    Average homeowner rating
  • Verified reviews icon15
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Oriskany

Noah Lamphear
New to Angi
Brick and Stone Driveways & Floors - Install

Serving Oriskany, NY and surrounding areas

Approved

In business since 2018

Free estimates

Offers commercial services

Noah Lamphear is a locally owned and operated company that values honesty and integrity in all aspects of our business. Our dedicated team of professionals have over 10 years of hands on experience, to provide innovative ideas and suggestions tailored to your projects. Our services are customized to your individual needs, paying close attention to the details of each project that we are involved with. Please feel free to contact us today! \n\n\n\n

...
Showing 1-10 of 90
Asphalt Driveways questions, answered by experts

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

Three inches is a great thickness for a residential asphalt driveway that sees minimal to moderate traffic from cars, SUVs, and pickup trucks. However, a thicker driveway can better withstand the weight of a heavier vehicle, such as a trailer or a recreational vehicle. If you drive a heavy vehicle on a thin driveway, you risk cracking and damaging it.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

The Oriskany, NY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.