Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Middleport, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Middleport, NY?

Select your specific project to find the pro for you.

TRUSTED BY MIDDLEPORT, NY HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon158
    Verified backsplash installation services reviews

Find Backsplash installation pros in Middleport

Shamrock Surfaces, LLC
New to Angi
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For Business

Serving Middleport, NY and surrounding areas

Approved

In business since 2005

Free estimates

Shamrock Surfaces, LLC is your premier provider of all types of flooring including carpet, vinyl, and tile. With 15 plus years experience, I am confident that you will be completely satisfied with our level of professionalism, attention to detail, and prompt completion of your home improvement, or business improvement project. Feel free to contact us today!

Tile Installation Company
5.0(
7
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Natural Stone (Granite, Marble, Slate, Quartz, etc) - Install+1 more

Serving Middleport, NY and surrounding areas

In business since 2022

Free estimates

Credit card accepted

"Paul and his team were professional and finished our living room tile job in four days. We love how it turned out. Paul was very helpful and knowledgeable. Would do business with again!"
New bathroom tile install
Bathroom floor
new tile install
new shower install
2nd bathroom floor tile and base install

+18

Response time1 day
Recommended by100%of homeowners
Showing 1-10 of 42
Backsplash Installation questions, answered by experts

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

Per the International Code Council, walk-in shower floors should have a minimum slope of 1/4-inch per foot (or a 2% slope) towards the drain. The slope should be no steeper than 1/2-inch per foot (or a 4% slope). This helps safely direct water into the drain rather than all over your bathroom.

Your floors should be completely level for tile, otherwise you risk damaging the tiles in the future. When there are even small gaps or hills in the subfloor beneath the tile, this puts more pressure on the tile when you walk around on the floor. With repeated traffic, the tiles are at risk of cracking, and you’ll have to deal with tile repairs sooner than if the floor was completely level.

Yes, it would be best if you waterproofed your shower walls before tiling. The cement backing board behind the tile is not waterproof; it’s only water-resistant. On top of your tile backing board, be sure to use a waterproof shower membrane before you start installing your shower tiles.

When tiling over concrete, you should install an anti-fracture membrane after the concrete has been prepared. The anti-fracture membrane acts as a moisture barrier and should be installed to protect the tiles from moisture which helps maintain their integrity. Often, Ditra, a brand name, is used interchangeably with moisture barrier.

The Middleport, NY homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.