Top-rated excavation pros.

Get matched with top excavation pros in Dayton, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Dayton, NY?

Select your specific project to find the pro for you.

Find Excavation pros in Dayton

Avatar for Bravestone construction
Bravestone construction
New to Angi
Landscape - Minor Grading or Resloping

Serving Dayton, NY and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

At Bravestone Construction, we provide reliable, high-quality construction and maintenance services for both residential and commercial clients. Our team is built on integrity, skilled craftsmanship, and a commitment to getting every job done right.\n\nFrom home improvements to commercial projects, we focus on efficiency, clear communication, and lasting results—no matter the size of the job.\n\nConsistency in service. Confidence in every result.\n

1 neighbors recently requested a quote
...
Showing 1-10 of 56
Excavating questions, answered by experts

Yes, chipmunk holes may have two or more entrances. Chipmunks can create an entire network of burrows. Having multiple entrances makes it easier for them when trying to escape from a predator, such as a snake, or if an entrance collapses due to flooding. Each entrance leads to the nesting chamber underground, which is where the chipmunk spends the majority of its time sleeping.

Depending on the severity of the freeze and the method used, thawing frozen underground pipes can take anywhere from 30 minutes to several hours. Applying heat directly to the pipe using heat tape, infrared lamps, or hot water jetting can speed up the process. However, patience and careful monitoring are key to avoiding pipe damage.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

How deep your septic system needs to be into the ground depends on several factors. In extremely cold environments, the tank needs to rest below the maximum frost line, which can be up to six or eight feet deep. The standard burying depth for most systems is between a few inches and four feet below ground level. Depth can also depend on the slope of the landscaping and other property variables. 

No, you typically cannot use metal detectors to find your sewer line. Most sewer lines are made of non-metallic materials such as PVC, clay, or cast iron, which are not detectable by standard metal detectors. Metal detectors are designed to locate metallic objects, so they won't be effective for identifying the path of a non-metallic sewer line. To locate your sewer line accurately, it's best to use other methods.

The Dayton, NY homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.