Top-rated excavation pros.

Get matched with top excavation pros in Dayton, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Dayton, NY?

Select your specific project to find the pro for you.

Find Excavation pros in Dayton

Avatar for Bravestone construction
Bravestone construction
New to Angi
Landscape - Minor Grading or Resloping

Serving Dayton, NY and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

At Bravestone Construction, we provide reliable, high-quality construction and maintenance services for both residential and commercial clients. Our team is built on integrity, skilled craftsmanship, and a commitment to getting every job done right.\n\nFrom home improvements to commercial projects, we focus on efficiency, clear communication, and lasting results—no matter the size of the job.\n\nConsistency in service. Confidence in every result.\n

...
Showing 1-10 of 55
Excavating questions, answered by experts

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

Some two-in-one tools and machines do both jobs, and those could be the right solution for smaller residential projects. However, the phrase “use the right tool for the job” definitely applies to digging. For the best results, get two separate tools for your trenching and landscape edging projects or call a pro to take care of everything for you.

Sewer lines can be buried anywhere from 18 inches to 8 feet deep, with a common average depth between 18 and 30 inches. The exact depth depends on local factors like climate and soil type. In colder regions, pipes must be buried deeper (below the frost line) to prevent freezing, sometimes as deep as 8 feet. The digging depth can also impact the cost of sewer line replacement. To find the specific depth for your property, you can check the building plans for your system, which should be on file with your city or local sanitation department since permits are required for installation.

There are many ways to cut through roots when digging, especially if your trencher doesn’t seem to be removing the roots. First, use a shovel to expose the roots. Then, use gardening shears to clear out smaller roots or a reciprocating saw to remove larger plant roots. If you plan on keeping the plant, avoid cutting any roots over 2 inches thick.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

The Dayton, NY homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.