Top-rated subcontractors.

Get matched with top subcontractors in Carthage, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Carthage, NY?

Select your specific project to find the pro for you.

TRUSTED BY CARTHAGE, NY HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon81
    Verified subcontracting services reviews

Find Subcontractors in Carthage

Avatar for High Tech Construction Co
High Tech Construction Co
4.3(
43
)
Major Home Repairs (General Contractor)

Serving Carthage, NY and surrounding areas

In business since 1987

Free estimates

Emergency services offered

"It went excellent!  Hi Tech Construction Co gave me a detail estimate of the job.  And compared to other estimates I received from several other companies, Hi Tech's was the most reasonably priced.  Hi Tech also gave me a timeline of the job from beginning to finish and they were right on target.  The crews showed up on time and carried out the job like experts - they surely looked like they knew what they were doing.  I noticed that they were very concerned about the safety of our neighbors, anybody passing by, their crews, and us.  They also cleaned everything right after they finished their job.  I was really happy with the timeliness and the quality of their job.  I will definitely strongly recommend Hi Tech.  I do not think you can go wrong with them.
"
Facade Restoration - High Tech Construction Co
stoop restoration -high tech construction co
Wood Stoop
Limestone Stoop
brownstone stoop and facade restoration

+20

Recommended by81%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Carthage, NY and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Carthage, NY and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 48
Subcontractors questions, answered by experts

Builder-grade is one of two types of stock cabinets, whereas semi-custom designs allow homeowners some control over the color, finish, or hardware on their cabinets. Stock cabinets are sold in construction-grade and builder-grade designs. Construction-grade cabinets are usually made from inexpensive medium-density fiberboard, which is prone to moisture damage, whereas builder-grade models are a step up with higher-quality materials. Construction-grade designs are the most common type of cabinets in America.

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Stone, marble, and brick are common building materials of Neoclassical architecture, though you will also find wood flooring and a range of natural stone tiles. Since several home styles fall under Neoclassical architects' umbrella, a range of building materials—including traditional wood framing—will make an appearance.

The Carthage, NY homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.