Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Burke, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Burke, NY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Burke

Avatar for Full Service Paving Corporation
Full Service Paving Corporation
4.0(
13
)

Serving Burke, NY and surrounding areas

Approved

In business since 2019

Free estimates

Small jobs welcome

"Great job for a driveway that serves 7 cottages in Hammond. Very steep driveway with 3 turnouts to the different cottages. Awesome job under some extreme circumstances. Shaun & the crew were extremely professional and went beyond what was contracted for. Would highly recommend Full Service Paving."
Commercial Parking Lot
Site Work-- Agricultural
Site Work-- Agricultural
Paving-- Agricultural
Commercial Paving

+19

Response time2 days
28 neighbors recently requested a quote
Recommended by80%of homeowners
Avatar for Full Service Paving Inc.
Full Service Paving Inc.
5.0(
3
)

Serving Burke, NY and surrounding areas

Free estimates

Credit card accepted

"They did an excellent work. The crew was really good- they know what they are doing. Showed up on time when they are supposed to. They're on time and pretty prompt. They also have qualified operators."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by100%of homeowners
Showing 1-10 of 25
Asphalt Driveways questions, answered by experts

Depending on project size, typically 1 to 3 days, including preparation and installation.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Burke, NY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.