Top-rated home builders.

Get matched with top home builders in Owyhee, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your home building project in Owyhee, NV?

Select your specific project to find the pro for you.

Find Home builders in Owyhee

Avatar for Choice Home Warranty
Choice Home Warranty
4.0(
5,678
)
Find a Custom Home BuilderFind a Modular Home Builder

Serving Owyhee, NV and surrounding areas

In business since 2008

Emergency services offered

Credit card accepted

"I called Choice and reported my problems. They issued a work order and within the hour, I had been notified by S & J Plumbing that they would be here on Thursday. I could not make the time, so I called them and they politely scheduled for the next day. They showed up early, looked over the problems , called in the work to make sure it was covered and they repaired or fixed everything that was needed. They worked on my house like they were working on their own home. After done, they completely cleaned up, reminded me that they guarantee their work, and left. The gentleman who worked on my house was a professional and a credit to his company. I cannot say enough about the quality of work and their concern for everything. I will never forget such a wonderful experience and will not hesitate to recommend Choice Home Warranty. Thank you so much."
Recommended by81%of homeowners
Avatar for Sentri Homes
Sentri Homes
2.8(
57
)
Find a Custom Home Builder

Serving Owyhee, NV and surrounding areas

In business since 2023

Free estimates

Emergency services offered

"I was very impressed with Sentri Homes - their customer service was excellent. They sent a subcontractor to install some vinyl laminate in my bathroom and he ended up getting glue all over the carpet in our bedroom. The sub ended up ghosting both me and Sentri, leaving me stuck with a ruined carpet. Sentri stuck with me for over a month to get the carpet replaced with the identical original and to get the vinyl job 100% completed. The carpet was a Home Depot exclusive and Sentri handled everything with them. I will be using Sentri for a much bigger renovation I have coming up soon, because I know that they will make sure everything gets done right no matter what problems come up. The vinyl looks great too."
20 neighbors recently requested a quote
Home Building questions, answered by experts

Most cottages are around 1,000 square feet, making them smaller than most other styles. However, cottages are defined more by their decor and architectural focus on simplicity, functionality, and a connection to nature than they are by a rigid square footage or floor plan. While cottages are defined more by their charm and appearance than size, the smaller footprint does help maximize the comfort and charm, and it keeps the focus on connection to nature and family.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

The average cost to build a modular home is around $270,000, and most modular homes total between $180,000 and $360,000. Of course, this price varies significantly by location, and the price tends to follow the cost of living in the area. There are quite a few other factors at play that can affect your pricing, including the following:

  • Number of bedrooms and bathrooms

  • Site preparation, including land clearing and leveling

  • Type of foundation

  • Utility connections

  • Cost of building permits

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

The Owyhee, NV homeowners’ guide to home building services

From average costs to expert advice, get all the answers you need to get your job done.