"The toilet needed to be replaced. I was told that I would only get the builder standard grade toilet even though I was signed up with the highest plan. The plumber was replaced my toilet with something that was definitely builder grade and not even close to what I had. I called CHOICE and they told me that it should have been replaced with something comparable to what I had. Twice they told me they were going to have my claim looked at and I have not received a call about it or any new information. The new toilet is wrong in size and specs and doesn't fit well where it is in the bathroom."
"I was very impressed with Sentri Homes - their customer service was excellent. They sent a subcontractor to install some vinyl laminate in my bathroom and he ended up getting glue all over the carpet in our bedroom. The sub ended up ghosting both me and Sentri, leaving me stuck with a ruined carpet. Sentri stuck with me for over a month to get the carpet replaced with the identical original and to get the vinyl job 100% completed. The carpet was a Home Depot exclusive and Sentri handled everything with them. I will be using Sentri for a much bigger renovation I have coming up soon, because I know that they will make sure everything gets done right no matter what problems come up. The vinyl looks great too."
Ernz Painting is dedicated to providing our customers with the best quality and craftsmanship. We are here to build relationships with our customers and communities. No job is too big or too small! We look forward to working with you!
It pays to hire a project manager or general contractor when you have a large-scale project that will take over a week to complete, especially when it involves structural changes and multiple subcontractors. This includes hiring a general contractor to build a house, add an extension, or manage other projects that need a building permit.
Whether a prefab home is worth it or not will depend on your personal needs and preferences. Overall, prefab homes tend to cost less than traditional homes, although they also tend to have lower resale values. Another thing to consider is that prefab homes usually last 50 to 60 years or longer, while traditional homes last 50 to 100 years or more.
Construction typically takes 3-6 months, including site preparation and assembly.
Builder-grade is one of two types of stock cabinets, whereas semi-custom designs allow homeowners some control over the color, finish, or hardware on their cabinets. Stock cabinets are sold in construction-grade and builder-grade designs. Construction-grade cabinets are usually made from inexpensive medium-density fiberboard, which is prone to moisture damage, whereas builder-grade models are a step up with higher-quality materials. Construction-grade designs are the most common type of cabinets in America.
Building a new home can be more expensive than buying an existing one, depending on the housing market in your area. Many homeowners still find that building a new house is worth the investment as they can choose the exact layout they want, as well as to choose their own floors, wall coverings, appliances, and finishes. If you live close enough to the build site, you can also stop by to check on the builder’s progress, which can provide some peace of mind that the project is worth it.
The Owyhee, NV homeowners’ guide to home building services
From average costs to expert advice, get all the answers you need to get your job done.
When building a home, going custom gives you the freedom to create your dream house. Learn about the cost to build a custom home and the factors to consider.
Thinking about a custom home building project? Learn about design options, average construction costs, and how to hire the right local pro for your new house.
Building your dream home starts with hiring a builder. Here is how to find a builder who understands your needs and preferences for your brand-new home.