"The toilet needed to be replaced. I was told that I would only get the builder standard grade toilet even though I was signed up with the highest plan. The plumber was replaced my toilet with something that was definitely builder grade and not even close to what I had. I called CHOICE and they told me that it should have been replaced with something comparable to what I had. Twice they told me they were going to have my claim looked at and I have not received a call about it or any new information. The new toilet is wrong in size and specs and doesn't fit well where it is in the bathroom."
"I was very impressed with Sentri Homes - their customer service was excellent. They sent a subcontractor to install some vinyl laminate in my bathroom and he ended up getting glue all over the carpet in our bedroom. The sub ended up ghosting both me and Sentri, leaving me stuck with a ruined carpet. Sentri stuck with me for over a month to get the carpet replaced with the identical original and to get the vinyl job 100% completed. The carpet was a Home Depot exclusive and Sentri handled everything with them. I will be using Sentri for a much bigger renovation I have coming up soon, because I know that they will make sure everything gets done right no matter what problems come up. The vinyl looks great too."
Ernz Painting is dedicated to providing our customers with the best quality and craftsmanship. We are here to build relationships with our customers and communities. No job is too big or too small! We look forward to working with you!
Remodeling a house is often less expensive than building a new house. You can expect to pay an average of $100 per square foot when you are remodeling. The cost to build a house averages about $150per square foot. When remodeling, though, some rooms cost more than $100 per square foot and some cost less. Use a home renovation cost estimator to accurately estimate your remodeling costs.
Yes, you can finance cottage construction through several options. Construction loans provide funds in stages as work progresses, while home equity loans or lines of credit are available if you have existing property. Some lenders offer a combined construction and permanent mortgage. Always review loan terms and payment milestones before committing.
Yes, such as using eco-friendly materials and energy-efficient designs for long-term savings.
Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.
Modular homes are a type of prefab home. Specifically, manufacturers first build modular homes in sections and then deliver them to the job site. The modules, or sections, are usually at least 70% finished before they arrive on your property.
In comparison, prefab homes arrive in panels or segments, and workers assemble them on-site. Generally speaking, modular homes tend to be more durable, and their consistent construction standards may mean you’ll have an easier time getting conventional home loans.
The Carlin, NV homeowners’ guide to home building services
From average costs to expert advice, get all the answers you need to get your job done.
When building a home, going custom gives you the freedom to create your dream house. Learn about the cost to build a custom home and the factors to consider.
Thinking about a custom home building project? Learn about design options, average construction costs, and how to hire the right local pro for your new house.
As a home builder, marketing can be a challenge because you’re not selling the typical product. So how do you tackle marketing as a new home builder or remodeler? Use these tips to get more jobs for your construction business today.