"I wanted to thank your company for doing an excellent job on the bathroom renovation. The communication regarding scheduling was timely, and the crews showed up on time and prepared. The work was performed with expertise and very detailed oriented. The owner of the company deserves many thanks for making this a smooth process."
"Cesar and his crew just finished a remodel of my master bathroom. This is the second major project completed in my home by CSZ (prior kitchen remodel) and once again they exceeded my expectations. Cesar worked with me along the way to come up with the perfect design to ensure all my requirements were met. He is knowledgeable and his attention to detail is second to none. The CSZ crew, Armondo and Benjamin were also a pleasure to work with. They are knowledgeable, trustworthy, and hardworking. They also did an exceptional job cleaning up at the end of each work day. My dog even loves them! I highly recommend CSZ Construction. They will most certainly be back for future projects in my home!"
"Bryan was awesome! He put three pieces of furniture together for me. All had electrical components to it. He also dismantled and unloaded all of the furniture that was here already. This was all after a fresh 4 inch snowfall. He was dedicated and friendly and made sure everything worked and was to my liking. Additionally, communication with A1 was exceptional and they were very reasonably priced. I would 100% use them again. My son is so happy for his new bedroom setup and my back is so happy for my new standing desk. Thank you Bryan and A1 Construction!!!"
"Alex and his partner did an amazing job. Alex was immediately responsive, and when the piece to be assembled (a complicated Murphy bed) arrived, I texted him and he came the same day. He and his partner were polite, knowledgeable, efficient, and did an exceptional job. I recommend them without reservation. Five stars!"
"Alex Matos did a wonderful job at our house! He gave a reasonable quote, took lots of measurements on his visit and made me feel like he knew what he was doing. He designed the railings himself and did a wonderful job making and installing them. The railings are very sturdy! I highly recommend Alex Matos."
Next Level HBR LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests and make their concerns the basis of our business.
Pool Table Assembly questions, answered by experts
Draining a pool with a garden hose can take between eight and 14 hours depending on the depth of your pool and whether you use a sump pump. Be sure to stay close to the pool during this time to ensure the structure of your pool remains unharmed and that the water drains properly.
In most states, it is a legal requirement to have a fence around your pool to protect both swimmers and pool owners. These laws can vary by state, city, and county, so you must research the specific regulations in your area before installation. The rules may also differ for inground versus above-ground pools, with inground pools typically requiring a full fence. Additionally, most homeowners' insurance providers will require a fence around a residential pool before providing coverage. As a general rule, it's always best to have a fence for everyone's safety.
You can use a plunge pool any time of the year, including winter. Be sure to install a pool heater if you plan to take a dip in the plunge pool when temperatures are low to avoid risk of hypothermia. You will also want to add a sturdy pool cover to protect the pool from snow, sleet, and rain during the winter months.
Yes, pool pumps use a significant amount of electricity, making them one of the biggest energy consumers in a home. A pool pump can use up to three times as much electricity as a refrigerator. Typically, a residential pool pump consumes about 1 kilowatt-hour (kWh) for every hour it runs. Because pumps often need to run for about eight hours a day to properly filter the water, this can add up to an annual consumption of 3,000 to 5,000 kWh, which can cost between $480 and $800 per year based on average electricity rates.
The amount of electricity your pump uses depends on its size, energy efficiency, and daily run time. To lower your energy consumption, you can choose an energy-efficient or variable-speed pump, ensure it is correctly sized for your pool, and run it only for the minimum time required to keep the water clean.
Pool concrete or gunite can take several weeks to cure, or an average of 30 days, before workers can resume construction. Additional work and finishes push the time to build a pool out of concrete to between three and six months. There are many types of pools that take far less time, so keep these in mind if you're on a short timeline.
The Rockaway, NJ homeowners’ guide to pool table assembly services
From average costs to expert advice, get all the answers you need to get your job done.
Need to know what pool resurfacing costs in New York, NY? Use this handy guide to get an accurate estimate for your project and see what factors can affect your total.
Learning how much it costs to refelt a pool table is the first step to getting your game back in top shape. Here's what to know about each type of table.
Pool tables and billiard tables come in a variety of sizes and designs. Read our buying guide to ensure you purchase the right one for your family’s gaming room.
Learn about home items that are nearly impossible to move without movers, either because they are awkwardly shaped, too heavy, or require special equipment.