Top-rated rototilling pros.

Get matched with top rototilling pros in Blair, NE

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Blair, NE?

Select your specific project to find the pro for you.

Find Rototilling pros in Blair



I J RICKMAN TREE & LANDSCAPING

5.00(
1
)

I J RICKMAN TREE & LANDSCAPING

5.00(
1
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

Owner Operated... I personally bid the jobs and will be on the job sight assuring the highest quality work! Payment is due upon completion unless a payment plan is agreed upon. Material costs (most of the time) are paid in advance.

Owner Operated... I personally bid the jobs and will be on the job sight assuring the highest quality work! Payment is due upon completion unless a payment plan is agreed upon. Material costs (most of the time) are paid in advance.


Rototilling questions, answered by experts

Water pooling, uneven surfaces, or basement leaks are indicators.

Professionals who complete perc tests can usually do them in a single day. Including excavating to expose the test site, filling the hole with water, and monitoring it while it drains, you can expect the test to take between four and eight hours total. It’s possible that you’ll get the results the same day, but some companies may take a few days to get official results.

Mobile homes need releveling every so often to maintain their structural integrity. Most mobile home manufacturers recommend releveling every three to five years. To keep the quality of your mobile home up for years and to avoid deterioration over time, proper maintenance is key.

Yes, an excavation company is the best option for land grading and yard leveling. General landscapers might be able to tackle these projects, but an excavation company will do a better job because they’re used to operating the necessary heavy machinery. Landscapers might opt to do the work manually, which takes much longer and could cost you more in labor fees. Finally, excavation companies will understand local regulations and know when you need permits to legalize the work, while a landscaper might not.

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.