Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Bayard, NE

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Bayard, NE?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Bayard

Avatar for Tillotson Enterprises, Inc.
Tillotson Enterprises, Inc.
5.0(
1
)

Serving Bayard, NE and surrounding areas

In business since 1997

Free estimates

Credit card accepted

"They did a really good job. They were very knowledgeable and explained what they were going to do. They were very professional. I highly recommend them."
Finished photo
After application of Top coat
Kearney Crime Lab
Roof after polyurethane foam & base being appl
Edge work

+8

Response time1 day
Response rate96%
Recommended by100%of homeowners
Avatar for Top-Line Coatings, LLC
Top-Line Coatings, LLC
New to Angi

Serving Bayard, NE and surrounding areas

In business since 2024

Free estimates

Emergency services offered

Thank you for considering hiring us for your project! At Top-Line Services\n we pride ourselves on quality work, integrity and competitive pricing. We believe in giving our absolute best, no matter how big or small your project. 308-672-0979\n\nWe are experts in our trade, and we will keep you educated and informed throughout the completion of your project. We treat your property like it's our own, with the utmost respect, just like we would our own family!\n\nAs the owner, my aim is to earn a 5-star review on the completion of your project. So, please let me know if at any time we are not living up to earning your perfect 5-star review.\n\nWe look forward to earning your business, so please ask us for references!

Response time6 hrs
Concrete Mudjacking questions, answered by experts

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

The average cost for mudjacking is around $1,200, though prices can range from $300 to $3,400. On a per-square-foot basis, you can expect to pay between $3 and $8, with an average of about $5 per square foot. The final cost depends on several factors, including the square footage of the concrete, the type of slab, its accessibility, whether it is load-bearing, and the type of material used to lift it. Generally, lifting a driveway, small patio, or sidewalk is less expensive than lifting a slab foundation or garage floor.

Pros often use mudjacking or polyurethane foam injection to level a sunken concrete patio. Both methods lift the slab by filling voids beneath it. After properly compacting the soil beneath it to prevent future settling, the concrete may need to be removed and re-poured for severe sinking.

Yes, expanding foam (also known as polyurethane foam) can lift concrete. This approach, called polyjacking, involves injecting the foam rather than concrete slurry to fill voids and raise the concrete slab back into place. It’s often faster and requires smaller drill holes than traditional mudjacking, though it may come at a higher cost. Some contractors also prefer polyjacking over mudjacking for more damaged and delicate slabs.

The timeframe is generally a few hours, allowing for immediate use post-hydration, ensuring minimal disruption to surrounding activities.

The Bayard, NE homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.