Top-rated subcontractors.

Get matched with top subcontractors in West End, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in West End, NC?

Select your specific project to find the pro for you.

TRUSTED BY WEST END, NC HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon808
    Verified subcontracting services reviews

Find Subcontractors in West End

Avatar for K Plus Handyman LLC
K Plus Handyman LLC
5.0(
10
)
Major Home Repairs (General Contractor)

Serving West End, NC and surrounding areas

Approved

In business since 2023

Free estimates

Warranties offered

"Kurt built a new deck for my family. He did a beautiful job, he pays attention to detail and even made a few changes I wanted to the gate. He’s courteous and he came when he said he would. I was very happy with his work and highly recommend him. Two thumbs up!!"
Sink before renovation
Breaking through the old floor to restructure and finish.
Bathroom renovation
Bathroom renovation
Bathroom renovation

+5

8 neighbors recently requested a quote
Recommended by90%of homeowners
GRC Corporation
New to Angi
Major Home Repairs (General Contractor)

Serving West End, NC and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with. \nCall us today you'll be pleased you did. Thank you

10 neighbors recently requested a quote
Avatar for Mike's Painting & Pressure Washing
Mike's Painting & Pressure Washing
4.7(
28
)
Major Home Repairs (General Contractor)

Serving West End, NC and surrounding areas

In business since 1996

Emergency services offered

Credit card accepted

"Mike and Crystal were very professional from the first phone contact through the completion of the work. They showed up on time, their work was neat and they worked very efficiently. My windows were in pretty bad shape. They really took their time and prepped them very well which showed in the finished product. When asked to redo or touch up anything it was done without question. In the end we received a very good paint job on a timely basis and at a competitive price. I have already recommended Mike's Painting to others in my neighborhood and would use him again for future painting needs.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+161

Recommended by91%of homeowners
...
Showing 1-10 of 53
Subcontractors questions, answered by experts

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

Yes, new home construction will always require building permits, no matter where you live. In most cases, you’ll need a general construction permit, along with plumbing and electrical permits for the utility lines in your home. Depending on where you live, you’ll likely find that you also need permits for things like connection to a sewage system or installing exterior components, like decks, driveways, patios, and curb cutouts. Leave navigating the permits required for new home construction to a professional to ensure your home is built legally and safely.

Yes, you can finance cottage construction through several options. Construction loans provide funds in stages as work progresses, while home equity loans or lines of credit are available if you have existing property. Some lenders offer a combined construction and permanent mortgage. Always review loan terms and payment milestones before committing.

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

The process typically takes 2-6 weeks, depending on the project size and level of customization.

The West End, NC homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.