Top-rated subcontractors.

Get matched with top subcontractors in West End, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in West End, NC?

Select your specific project to find the pro for you.

TRUSTED BY WEST END, NC HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon809
    Verified subcontracting services reviews

Find Subcontractors in West End

Avatar for K Plus Handyman LLC
K Plus Handyman LLC
5.0(
10
)

Serving West End, NC and surrounding areas

Approved

In business since 2023

Free estimates

Warranties offered

"Kurt built a new deck for my family. He did a beautiful job, he pays attention to detail and even made a few changes I wanted to the gate. He’s courteous and he came when he said he would. I was very happy with his work and highly recommend him. Two thumbs up!!"
Sink before renovation
Breaking through the old floor to restructure and finish.
Bathroom renovation
Bathroom renovation
Bathroom renovation

+5

8 neighbors recently requested a quote
Recommended by90%of homeowners
GRC Corporation
New to Angi

Serving West End, NC and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with. \nCall us today you'll be pleased you did. Thank you

9 neighbors recently requested a quote
Avatar for Mike's Painting & Pressure Washing
Mike's Painting & Pressure Washing
4.7(
28
)

Serving West End, NC and surrounding areas

In business since 1996

Emergency services offered

Credit card accepted

"Mike and Crystal were very professional from the first phone contact through the completion of the work. They showed up on time, their work was neat and they worked very efficiently. My windows were in pretty bad shape. They really took their time and prepped them very well which showed in the finished product. When asked to redo or touch up anything it was done without question. In the end we received a very good paint job on a timely basis and at a competitive price. I have already recommended Mike's Painting to others in my neighborhood and would use him again for future painting needs.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+161

Recommended by91%of homeowners
Avatar for RH-Flooring and Remodeling LLC
RH-Flooring and Remodeling LLC
5.0(
7
)

Serving West End, NC and surrounding areas

In business since 1997

Free estimates

Emergency services offered

"Services were performed on budget and met our timeline. We were under a lot of pressure to get into our new home. Rick did what it took to help us. He is very easy to work with. We were / are grateful to know him and will definitely hire again for any future projects."
Custom tiled shower
Master bathroom remodel
Master bathroom remodel
Master bathroom remodel
Master bathroom remodel

+66

Recommended by100%of homeowners
...
Showing 1-10 of 53
Subcontractors questions, answered by experts

Services include creating technical drawings, floor plans, and 3D renderings for construction or renovation projects.

The process involves initial consultation, concept development, detailed planning, regulatory approvals, and integration of contractor work for project execution.

The only real drawback to green building is that it’s more expensive up front, with per-square-foot prices sitting 33% higher than what you’d pay to build a traditional home. The higher cost is due to more expensive building materials and more labor to ensure every aspect of the home is as efficient as possible. However, green buildings often save money in the long run, so this is just a temporary downside.

Mid-century modern architecture was a popular home style throughout the U.S. from the 1950s to 1970s. Most homes feature a wide and symmetrical floor plan with low-sloped roofs and floor-to-ceiling windows. Its minimalism and balanced appearance are back on the home style scene, particularly when maximizing sunlight, airflow, and a blend with the home's natural surroundings.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

The West End, NC homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.