Top-rated contractors.

Get matched with top contractors in Rowland, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Rowland, NC?

Select your specific project to find the pro for you.

Find Contractors in Rowland

Avatar for Julian Tile & Hardwood Contractor
Julian Tile & Hardwood Contractor
4.5(
37
)

Serving Rowland, NC and surrounding areas

In business since 2006

Free estimates

Credit card accepted

"After reviewing several quotes from different contractors we decided on Julian for our project and are very glad we did. Julian is fantastic. He and his team are prompt , professional, and fair. Would highly recommend to anyone and will be using him again for any future projects."
Recommended by93%of homeowners
Avatar for Tammy's Cleaning & Handyman Services
Tammy's Cleaning & Handyman Services
4.9(
20
)

Serving Rowland, NC and surrounding areas

In business since 2011

Free estimates

Emergency services offered

"Repositioned siding that had dislodged from other siding. Job was completed very professionally. Excellent service was performed. Paid attention to detail. Would definitely recommend this companies service again."
Handymen Project
Handymen Project
Handymen Project
Additional Photos
Additional Photos

+45

Recommended by94%of homeowners
Avatar for Mike's Painting & Pressure Washing
Mike's Painting & Pressure Washing
4.7(
28
)

Serving Rowland, NC and surrounding areas

In business since 1996

Emergency services offered

Credit card accepted

"

We recently purchased a 2nd home on Lake James with an exterior that is 100% cedar.  The exterior was in serious need of cleaning and re-staining.  It had not been maintained; and, had a significant amount of mold staining and several areas of the trim had the original finish peeling off.

We contracted with Mike and Crystal to prep and re-stain the exterior of our home.  Throughout the process, Mike demonstrated thoroughness, competency and responsibility.  Mike and Crystal took personal responsibility to ensure they delivered a quality product.  Mike kept his commitments and did not compromise his work product even when faced with the stripping process taking more time than he expected.  He completed the project per the schedule he committed.

Mike demonstrated a high attention to detail in the finishing process and ensured the project was completed to my satisfaction.  The home looks beautiful...we could not be happier.

I solicited bids from several paint contractors and evaluated several before selecting Mike.  His pricing was very competitive versus several other contractors; but, I never observed where Mike cut corners.

I would definitely recommend MIke's Painting and will plan to use Mike again when we have painting needs.


"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+161

Recommended by91%of homeowners
Avatar for Granite Transformations of Raleigh-Durham
Granite Transformations of Raleigh-Durham
4.6(
106
)

Serving Rowland, NC and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"We unfortunately experienced a number of problems and communications issues throughout the process with Granite Transformations, and as a result the job experienced several delays.  It seemed like a situation where if something could go wrong, it did in more cases than not.   However in the end, it means a lot that the owners of GT recognized the issues, stood behind their business, and worked hard to earn our satisfaction. GT requests payments at time of signing the contract, and then at points during the process (e.g. cabinets installed, templates drawn, etc).  All who we spoke with at GT on the phone and those who performed work in our home were professional. The end result is a quality product, but the journey to get there was not expected.
Here is a chronology of events:
- Fri August 16th: a GT salesman came to our home with vanity cabinet and surface samples, outlined how the process worked, and we signed a contract to replace Master Bath Vanity Cabinet and Double-sink Top, and reface Half Bath Vanity Cabinet front as well as replace its Single-sink Top. Three new faucets were also included. GT to handle all plumbing hookups.  GT gave us access to an electrical contractor. The saleman explained that work would not begin until all materials were ready to go. At that point GT would install the new Master Bath cabinet, reface the Half Bath cabinet front, and do a template for both tops.  2-3 days after that, the tops and sinks would be installed, then the faucets hooked up.
- Fri October 4th: GT had called end of Sept to let us know all materials were in.  Upon the installers arriving at our house, GT let us know there was a mixup and the Master Bath cabinet had not yet come in.  So GT refaced the Half Bath cabinet.  However upon completion it was resurfaced in a White color rather than the Cherry color we had selected.
- Mon October 21st: GT removed the existing Master Bath cabinet, capped the plumbing, and installed the new cabinet. The Half-bath cabinet was refaced with the correct Cherry color.  Templates were drawn up to make the tops.
- Fri October 25th: GT was to install the Vanity Tops in both baths, however called the evening of Thurs Oct 24th to inform us that workers had dropped and broke the Master Bath top so it would need to be remade.  The composite used for the top was out of stock locally, so would have to be ordered.  With the Master Bath vanity out of commission since the plumbing was capped, we decided to leave the half-bath as is and have GT install the top in the half-bath when the Master Bath top was ready.
- Mon October 28th: The Electrical contractor completed the electrical work scheduled for the Master Bath.  His work was excellent, and price was very reasonable.
- Fri November 8th:  GT installed the Master Bath Vanity Top, Sinks, and Faucets.  This was about Three Weeks after GT had installed the new cabinet there and capped the plumbing.  GT installed the Half Bath Vanity Top, Sink, and Faucet. GT requested full remaining payment at this point, however since both of us were not available to inspect the work, we asked to pay the next day at their store which GT said was acceptable.
- Sat November 9th:  Upon waking up, we were greeted with water on the Master Bath floor, leaking from one of the sinks. Also, upon comparing both Master and Half Bath vanity tops to the samples we had in our possession, we discovered neither top matched its respective sample.  We had travel plans for the weekend, however due to the leak one of us stayed home. we called the plumber (Mr Water Heater, who we found out is owned by the local GT company) and learned they only work Mon-Fri 8-5ish and do not have emergency service.  Upon calling the GT store after it opened, I was told I may need to wait until Monday to have the plumbing issue looked at.  Given the various issues experienced, and the new leak, I asked to have the GT owner call me to discuss the issues.  Jonathan Lamb, GT co-owner called me, and as a result agreed to have a plumber resolve the leak over the weekend (which was done), and then work with us the following week on the other issues.
- Fri November 15th:  Mel Lamb, GT co-owner, came out to our house to inspect the sink top matches to the samples, and the overall experience we had.  He agreed they did not match what we were shown when we signed the contract. We decided to leave the Master Bath alone at this point since the colors worked fine, but Mel offered to replace the Vanity top in the Half Bath at no cost to us, and we accepted as the combination in there did not look right.  We also discussed the other issues.  Mel was not aware of the leak in the Master Bath the previous Saturday, but reassured us that he was aware things on this project did not go right, and that he was there to make things right. Mel made a trip back to the store to get new samples, and we selected from those for the new half bath top. He also offered a final discount on our remaining payment.
- Mon November 25th: Half bath top and sink were reinstalled, and faucet hooked up.  Final payment made in full.
So in summary, the jobs were completed about 15 weeks after the contract was signed, and about 7 weeks after work was started. During the course of our work, we dealt with about a dozen different people including office staff, installers, plumbers, salesman, co-owners, etc. and generally had to bridge communications among them... in our view it would have helped had a single project focal point been assigned.  We were surprised that after signing the contract with our salesman, that we never heard from him again during the project or as part of completing the project.  We also experienced that on several occasions work was not completed correctly on the first attempt which led to reschedules, delays, canceled plans, adhock needs, etc which was inefficient to both GT and the customer.  The local GT seems to be growing, and perhaps these are growing pains as a result of expanding their business.  Hopefully our experience will help bring some changes to the GT process and communications that will help other customers, and help us, should we do business again with GT further down the road.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+7

Recommended by93%of homeowners
Avatar for Cobalt Roofing & Construction
Cobalt Roofing & Construction
3.9(
212
)

Serving Rowland, NC and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"David was great.  He assisted in working with the insurance company so that we got a fair settlement on the claim.  We had several rain delays but when the weather looked like we were going to have a few days of sun, his crew showed up early and started right to work.  They worked very hard the first day removing everything down to the rafters and then getting the OSB laid and the waterproofing on quick in case of rain.  On day two the framers came and did a fantastic job getting rid of the flat roof.  
The roofers worked ceaselessly trying to get the roof on before the rain that wasn't supposed to happen came.  When it started raining they quickly tarped the roof so that the contents of the house were protected.  They did a fantastic job on the roof, fascia, painting.  I was very impresses on the rebuild of a overhang, and the cut in of the flashing around my chimneys.  They are a very professional company that really care about the quality of the work that they do.
Cobalt and David are my contractor and I have already hired him to help with other jobs on my home.  I have recommended him to my friends and give him a double thumbs up.


"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+39

Recommended by82%of homeowners
...
Showing 1-10 of 66
Unfinished Carpentry questions, answered by experts

The best way to calculate framing costs is by basing your costs on the square footage of your home. On average, framing your home could cost anywhere between $7 and $16 per square foot. 

To ensure you don’t go over budget, base your estimates on the higher end of the price range. If you know you’re going to use high-end materials or require a custom or complex build, you might even want to tack on an additional 5% of your budget.

Bow windows need support because they are large and extend out from the exterior wall of the home. Bow windows may extend 1 foot to several feet from the outside of the home, so you’ll need to provide additional support to handle this weight. A window contractor will be able to provide the proper amount of support for your new bow window.

No rules state how much of a load-bearing wall can be removed. Rather, you need to adequately support any area that is removed. Support should always be added to as much wall area is being removed. Failing to support the area properly will result in structural damage.

Framing is the shell of the house. It includes several steps, including studs, plumbing, and electricity. A professional will ensure the wall frame is secured for the house’s structural integrity. 

Framing prices change depending on the material and whether the wall is load-bearing. Most contractors use wood to frame a home, but metal is another popular choice.

The cost to install a bow window can range from $1,500 to $15,000, with a national average of $3,900. The total price includes materials, which can cost between $1,200 and over $14,000, and labor, which typically adds $300 to $1,900. Several factors influence the final cost, including the window's size and frame material. For example, vinyl frames are the most budget-friendly option, while wood frames are more expensive. Custom features or energy-efficient upgrades will also increase the price. For comparison, a bay window installation typically costs between $1,000 and $7,000.

The Rowland, NC homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"