Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Goldston, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Goldston, NC?

Select your specific project to find the pro for you.

TRUSTED BY GOLDSTON, NC HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon10
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Goldston

Avatar for Planet Paving LLC
Planet Paving LLC
4.7(
47
)
Asphalt Paving - InstallAsphalt Paving - Repair or PatchAsphalt Paving - Install- For Business+1 more

Serving Goldston, NC and surrounding areas

Approved

In business since 1957

Free estimates

Emergency services offered

"Satisfied to the utmost. Ronnie was very knowledgeable, courteous and professional. He and his crew took the time to explain everything that was being done and completed the job in the time he (Ronnie) stated. I was truly impressed with the quality of work done for the price I paid. My next door neighbor came over and surveyed the new/widened driveway and is now making plans to have his driveway redone by PAVE ALL. Again Ronnie and his Crew did an outstanding job and I will not hesitate to recommend them and PAVE ALL. Norman S."
Hot Asphalt
New parking lot install
Relay
Relay
Relay

+1

Response time2 days
10 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for Nicolas' Hardscapes & Drainage LLC
Nicolas' Hardscapes & Drainage LLC
4.9(
451
)
Brick and Stone Driveways & Floors - InstallInterlocking Pavers for Driveways & Floors - Install

Serving Goldston, NC and surrounding areas

Approved

Super Service Award Winner

In business since 2001

Free estimates

Warranties offered

"Nicholas provided professional design advice in delivering a driveway extension that incorporated a great solution to a drainage issue. The scope of work included digging and preparing crush and run underlayment, concrete pours to incorporate drains, digging channels and laying pipe, laying and binding pavers, yard grading, as well as removing construction debris and cleaning site. All done with quality workmanship."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+171

Recommended by97%of homeowners
Avatar for Tycoon Sealcoating LLC
Tycoon Sealcoating LLC
5.0(
4
)
Asphalt SealingAsphalt Paving - Repair or Patch

Serving Goldston, NC and surrounding areas

Approved

In business since 2024

Free estimates

Credit card accepted

"I couldn?t be happier w/ the work Tycoon Asphalt did on our driveway. From the first phone call to the finished project, the team was professional, honest, and incredibly detail oriented. They arrived on time, explained the entire process, and delivered exactly what they promised. The driveway looks brand new, and the quality of the workmanship really stands out. If you?re looking for a reliable asphalt company that takes pride in their work, I highly recommend Tycoon Asphalt. We?ll definitely be using them again for future projects!"
18 neighbors recently requested a quote
...
Showing 1-10 of 174
Asphalt Driveways questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The decision to repair or replace your driveway depends on the extent of the damage. If your driveway has a few small cracks, a simple repair will do the trick. If you see larger cracks and potholes, it may be time to consider resurfacing or replacement. Resurfacing is a great option if more than 25% of the surface is damaged, but if the damage is extensive—deep cracks or significant sinking—it’s best to replace the driveway entirely. A new driveway, with proper care, can last decades while patching or resurfacing might only hold up for a few years before needing more attention.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

Regular cleaning, sealing, and timely repair of cracks help maintain its condition.

Concrete is typically the best material for a driveway if you’re looking for longevity, cost-effectiveness, and ease of maintenance. But, it’s not ideal for areas with annual freeze-frost cycles, nor is it the most attractive option—although you can get it stamped or painted. If your location is consistently below freezing, asphalt may be a better choice.

The Goldston, NC homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.