Top-rated sandblasting pros.

Get matched with top sandblasting pros in Foxfire, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your sandblasting service project in Foxfire, NC?

Select your specific project to find the pro for you.

TRUSTED BY FOXFIRE, NC HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon166
    Verified sandblasting services reviews

Find Sandblasting pros in Foxfire

Avatar for Hawkins Renovations LLC
Hawkins Renovations LLC
5.0(
14
)
Exterior Surfaces - SandblastingExterior Surfaces - Sandblasting - For Business

Serving Foxfire, NC and surrounding areas

In business since 2022

Free estimates

Small jobs welcome

"I was extremely pleased with the professionalism, punctuality, cleanliness and ease of this service. Mr. Hawkins explained and ensured I was satisfied. I truly appreciated his work. I would definitely recommend his services to anyone! I, for one, will be calling upon him in the very near future! Thanks again! :)"
Response time3 days
Recommended by92%of homeowners
Showing 1-10 of 20
Sandblasting Services questions, answered by experts

Your pro will most likely bill you at an hourly rate of $50 to $80 per hour to sandblast a door due to its small size. This type of job won't take long, so if you have other surfaces that need cleaning, schedule those tasks at the same time to get your money's worth from your pro's visit.

Most projects take 1-3 days, depending on the surface area and complexity.

Soda-blasting systems are slightly more expensive than sandblasting systems. To soda blast, you’ll need to spend a few hundred dollars for a blast hose and nozzle, a compressed air supply, a blast generator, a moisture decontamination system, and sodium bicarbonate media, a recurring cost because the powder is not reusable. To start with sandblasting, you will need to spend upwards of $30 for a blast pot, a blast gun, an air compressor, and sandblasting media, many of which are recyclable—further reducing the cost. The total cost for either will depend on the size of the system.

Sand is a common sublayer for hardscape features like driveways, paver patios, and more. Most projects that involve sand require a 1-inch layer to promote evenness, drainage, and weight distribution. For further drainage, most projects have a 6-inch minimum layer of gravel beneath the sand. 

If you’re DIYing the project, it could take up to a week if you aren’t able to dedicate full-time hours. If you hire a professional and they arrive with a team, expect your stairs to be sanded in as little as 2 hours (for simple projects). Finishing the stairs takes a while longer as there are drying and sealing times to consider, but the actual work will take much less time than the sanding portion.

The Foxfire, NC homeowners’ guide to sandblasting services

From average costs to expert advice, get all the answers you need to get your job done.