Top-rated driveway sealcoating pros.

Best driveway sealcoating pros near Union, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Union, MS?

Select your specific project to find the pro for you.

Top-Rated Driveway sealcoating pros in Union - Updated Nov 2026

Avatar for J And B Equipment, LLC
J And B Equipment, LLC
3.0(
2
)
Asphalt SealingAsphalt Sealing- For Business

Serving Union, MS and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"Wonderful. We had a contractor do us wrong on our roof two years ago. Jonathan and Brandy took the tin off and rebuilt all the braces and fixed it perfect. He and his crew did a wonderful job at a great price. I will call him for anything I need. He does great quality work."
Clean up after storm
Driveway
Clean up after storm
Recommended by50%of homeowners
Waymore Paving and Seal Coating
New to Angi
Asphalt Sealing

Serving Union, MS and surrounding areas

In business since 2013

Free estimates

Emergency services offered

Waymore Paving is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Driveway Sealcoating FAQs, answered by experts

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Yes, sealing is included to prevent staining and moisture absorption, depending on the stone type.

Commercial lots should be sealed every 2-3 years to prevent cracks and weather damage.

Hot-pour sealants have an asphalt cement base that might also include rubber and other materials to allow the seal to flex in hot or cold temperatures. Asphalt emulsion sealants are not heated but are liquid applications that use water and an emulsifying agent to allow the asphalt and water to mix.

The Union, MS homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.