Top-rated basement remodelers.

Best basement remodelers near Saint Martin, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Saint Martin, MS?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Saint Martin - Updated Nov 2026

Avatar for Country Remodeling and Renovation LLC
Country Remodeling and Renovation LLC
5.0(
6
)
Basement - Remodel

Serving Saint Martin, MS and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"Dakota and his team were very professional and did a great job repairing a wall and a ceiling. Dakota was very quick to communicate and return calls. Ive had bad experiences with contractors in the past and given how hard it is to find a good one I would definitely go back to country remodeling."
Response time1 day
Response rate100%
5 neighbors recently requested a quote
Avatar for Warren Builders LLC
Warren Builders LLC
New to Angi
Basement - Remodel

Serving Saint Martin, MS and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

Warren Builders LLC is dedicated to providing our customers with the best quality and \ncraftsmanship. We are here to build relationships with our customers and communities and to provide our employees with a great place to work. For over four decades, Warren Builders, LLC has been a trusted name in construction and land development across the Southeast. Our commitment to integrity, quality, and customer satisfaction is the foundation of everything we do. We look forward to working with you!

New Home
New Home
New Home
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Saint Martin, MS and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 32
Basement Remodel FAQs, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

In addition to overseeing new home builds, construction managers work on large renovations and major remodels. For example, they may work with designers and oversee the construction of a finished basement, kitchen renovation, or a home addition. They may also oversee large-scale remodels, such as the update of a historic home. Construction managers step into small projects for more specific assistance, such as building budgets and compiling the team.

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

The Saint Martin, MS homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.