Top-rated basement remodelers.

Get matched with top basement remodelers in Helena, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Helena, MS?

Select your specific project to find the pro for you.

Find Basement remodelers in Helena

Avatar for Country Remodeling and Renovation LLC
Country Remodeling and Renovation LLC
5.0(
6
)
Basement - Remodel

Serving Helena, MS and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"Dakota and his team were very professional and did a great job repairing a wall and a ceiling. Dakota was very quick to communicate and return calls. Ive had bad experiences with contractors in the past and given how hard it is to find a good one I would definitely go back to country remodeling."
Response time1 day
Response rate100%
3 neighbors recently requested a quote
Avatar for J and A Construction
J and A Construction
5.0(
7
)
Basement - Remodel

Serving Helena, MS and surrounding areas

In business since 2015

Free estimates

Emergency services offered

"We were very satisfied with J and A Construction. He was prompt when it came to looking over project, giving us an estimate, performing work (went over and above), completed project to our satisfaction. Will and already have recommend this contractor."
Remodeling - Kitchen & Bathroom Project
Catico
Catico
Catico
Catico

+26

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Helena, MS and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 30
Basement Remodel questions, answered by experts

Although homeowners often use the terms basement remodeling and basement finishing interchangeably, they are quite different terms. 

Finishing a basement is the process of taking a basement space that is not habitable and adding elements to make it usable. This includes adding plumbing, flooring, and insulation.

Remodeling a basement means taking an already existing finished basement and changing it, often by adding or removing walls, adding plumbing, or changing the existing flooring.

Kitchens and bathrooms are typically the most expensive rooms to renovate. The high cost is due to several factors, including expensive appliances like ranges, hoods, and refrigerators, as well as costly fixtures. The 'bones' of the room, such as electrical and plumbing, are also expensive to move or replace. Because of the vast amount of prep work, finishing, and specialized labor involved in a relatively small footprint, these projects can cost double or more than a living space remodel. Even when trying to renovate on a budget, kitchens and bathrooms will likely carry a hefty price tag.

Anything having to do with the structure of your home, such as raising the ceiling, is usually the most expensive part of finishing a basement. Another project component that could be a surprisingly high expense is adding an exterior entrance. 

The cost of a walkout basement can be anywhere from $5,000 to $35,000.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

The Helena, MS homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.