Top-rated generator install pros.

Get matched with top generator install pros in Ridgeland, MS

Enter your ZIP and get matched with up to 5 pros

Find Generator install pros in Ridgeland

No results for Generator install pro in

Try adjusting your search criteria.
Showing 1-10 of 24
Generator Install questions, answered by experts

In most municipalities, you will need a permit to install a permanent home generator, including emergency backup, partial-home, and whole-home generators. A permit for a generator usually costs between $50 and $250, depending on where you live. Your electrician or certified generator installer will usually pull the permit for you—and might be required to do so by your building department—but you’ll be on the hook for the cost of the permit. You should ask your installer before agreeing to any work if they will pull the necessary permits for your project.

Yes, installing a generator usually increases your property value because buyers are getting the added peace of mind knowing they’ll be able to maintain power through blackouts. In most cases, you should see close to a 100% return on investment (ROI). Keep in mind that home generators usually need a permanent foundation, and installing a concrete slab will likely raise your property taxes slightly.

You can expect a diesel generator to last for up to 30,000 hours of use, which works out to 20 to 25 years with the proper maintenance, of course. That depends on how much you use it, so a diesel generator used for emergencies a couple of times a year will last a lot longer than a generator that takes over for a faulty electrical grid every month for a day or two. 

A whole house generator can be worth the extra money for peace of mind if your home is prone to power outages for extended periods of time or if you have life-saving medical equipment that needs to maintain power at all times. These devices can also increase your home’s value, especially in areas prone to extreme weather and power outages.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

The Ridgeland, MS homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.