Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Marks, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Marks, MS?

Select your specific project to find the pro for you.

Find Ceramic tile pros in Marks

Darryl's Stones and Tile
New to Angi
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Repair

Serving Marks, MS and surrounding areas

In business since 2010

Free estimates

With over 8 years of experience, Darryl's Stones and Tile is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests and make their concerns the basis of our business. Call us today! \n \n

Showing 1-10 of 47
Ceramic Tile questions, answered by experts

Most professional shower tile installations take between six and eight hours, depending on the size and complexity. Most projects get completed in a single workday. DIY-ing the project takes around three to four days or roughly 16 hours. However, this will vary based on the skill level of the person completing the work.

You cannot tile directly over hot mop waterproofing because tile requires a smooth, solid surface to adhere properly. Additionally, the shower bed pan needs to be raised and sloped toward the drain to prevent water from pooling. However, you can hot mop and apply a sloped mortar bed over the top (to which the tile can then be adhered). 

Tile installation can be expensive because it requires more time and labor to install than many other materials. For example, laminate flooring can click and lock into place, and carpet comes in large rolls that you can secure to the floor. On the other hand, tiles need to be cut, laid individually, grouted, and left to cure.

On average, tiling a bathroom involves about 12 hours of labor, usually spread over two to three days to accommodate prep work and curing times. A professional tiler can often complete the installation in 6 to 8 hours, whereas a DIYer might take 10 to 16 hours. The total project time is influenced by factors like the bathroom layout, tile type, and necessary prep work, such as removing old tile. The process includes specific timelines for different areas; for example, tiling a floor takes about six hours, while a shower area can take six to ten hours. It is essential to allow for adequate curing time—typically 24 hours each—for the mortar, grout, and caulk, which is why the project extends over several days.

You can lay tile directly on a plywood countertop, but if it’s a high-traffic surface in a kitchen, it’s better to add a moisture-resistant base. Plywood is susceptible to moisture, so if dampness seeps through from the surface around the sink or where you prep food, it can cause the plywood to warp, leading to grout damage, cracked tiles, or mold growth under the surface. 

The Marks, MS homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.