Top-rated excavation pros.

Get matched with top excavation pros in Coffeeville, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Coffeeville, MS?

Select your specific project to find the pro for you.

Find Excavation pros in Coffeeville

Roberts Paving & Construction, LLP
1.0(
1
)
Excavation - Major Grading or Resloping

Serving Coffeeville, MS and surrounding areas

Approved

In business since 1965

Free estimates

Credit card accepted

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with. \n\nCall us today you'll be pleased you did. Thank you

Avatar for The Old Anvil
The Old Anvil
5.0(
4
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Coffeeville, MS and surrounding areas

In business since 2024

Credit card accepted

"Noah is a very professional young man that has a great understanding on how to perfect a existing mechanical operation. We have also used him to design new electrical conveyors & sorters for the packing operation. lots of talent with this guy! Give him a shout."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by100%of homeowners
Avatar for McCurtain Creek Contracting, LLC
McCurtain Creek Contracting, LLC
4.8(
4
)
Building Site - Preparation and Clearing - For Business

Serving Coffeeville, MS and surrounding areas

In business since 2022

Free estimates

Offers commercial services

"They prepared a foundation site for our 30x50 storage shed and the work was top notch. Not only did he prepare the site, he cleaned up all the trees that had to be cut down. While he was there I asked if he could bury a conex for me that I would like to use for a storm shelter and he was willing to do that the same week without any problem. Both projects turned out great! I also hired them to do excavation work behind my business to keep water from coming into the building when it rains and since that work has been done the rain doesnâ t flood my building anymore. Iâ ve been very pleased."
Before photo
Removing brush
Finished pad
before photo
after photo

+21

Response time6 hrs
Response rate91%
Recommended by100%of homeowners
Showing 1-10 of 48
Excavating questions, answered by experts

Prior to excavation, you should prepare the dig site and call 311 before you sign anything.

To get your site ready for excavation, you should move anything in the area that isn’t affixed to the land. You can save money on the excavation by removing hardscaping, including walkways, decks, concrete patios, and paver patios.

Before you carry out any digging, you should call 311 to confirm that there are no utility lines running through your excavation site. Skipping this step could lead to severe injury and property damage if your excavator hits a water, sewage, or gas line.

The cost to drill a well varies, with a national average of around $5,500 for a 150-foot well. However, prices can fluctuate significantly based on several factors, including your location, the required well depth, geological conditions, local regulations, and the specific drilling methods used. For the most accurate cost assessment, it is best to research and get quotes from local well-drilling professionals in your area.

Most professional excavation teams will charge between $8 and $15 per cubic yard. Calculate the cost by finding the volume of your pool—width x length x depth—and dividing it by 27. Then, multiply the price by the cubic yards from your equation. Budget for complications like a rocky lawn, hard-to-access pool area, or high local labor prices.

No, a ditch isn’t a trench. A ditch is an open, relatively shallow channel that’s carved out of the ground and used for drainage purposes. In contrast, a trench is a deeper excavation that’s entirely underground. Trenches have many uses, including gas lines, sewage systems, and electrical wiring. Unlike trenches, ditches don’t get filled back in with dirt after they’re dug.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

The Coffeeville, MS homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.