Top-rated excavation pros.

Get matched with top excavation pros in Coffeeville, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Coffeeville, MS?

Select your specific project to find the pro for you.

Find Excavation pros in Coffeeville

Roberts Paving & Construction, LLP
1.0(
1
)
Excavation - Major Grading or Resloping

Serving Coffeeville, MS and surrounding areas

Approved

In business since 1965

Free estimates

Credit card accepted

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with. \n\nCall us today you'll be pleased you did. Thank you

Avatar for The Old Anvil
The Old Anvil
5.0(
4
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving Coffeeville, MS and surrounding areas

In business since 2024

Credit card accepted

"Noah is a very professional young man that has a great understanding on how to perfect a existing mechanical operation. We have also used him to design new electrical conveyors & sorters for the packing operation. lots of talent with this guy! Give him a shout."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by100%of homeowners
Avatar for McCurtain Creek Contracting, LLC
McCurtain Creek Contracting, LLC
4.8(
4
)
Building Site - Preparation and Clearing - For Business

Serving Coffeeville, MS and surrounding areas

In business since 2022

Free estimates

Offers commercial services

"They prepared a foundation site for our 30x50 storage shed and the work was top notch. Not only did he prepare the site, he cleaned up all the trees that had to be cut down. While he was there I asked if he could bury a conex for me that I would like to use for a storm shelter and he was willing to do that the same week without any problem. Both projects turned out great! I also hired them to do excavation work behind my business to keep water from coming into the building when it rains and since that work has been done the rain doesnâ t flood my building anymore. Iâ ve been very pleased."
Before photo
Removing brush
Finished pad
before photo
after photo

+21

Response time6 hrs
Response rate91%
Recommended by100%of homeowners
Showing 1-10 of 48
Excavating questions, answered by experts

While you can save some money by digging your own pool, you may end up paying more in construction equipment rental fees in the long run. You could, however, focus your DIY energies on lowering the cost of leveling your lawn for your pool or filling in surrounding landscaping after construction.

How deep your septic system needs to be into the ground depends on several factors. In extremely cold environments, the tank needs to rest below the maximum frost line, which can be up to six or eight feet deep. The standard burying depth for most systems is between a few inches and four feet below ground level. Depth can also depend on the slope of the landscaping and other property variables. 

Directional drilling is complex and requires training to use the advanced machinery. It can be challenging to monitor the position of the drill since there’s no direct line of sight. Directional drilling can also be more expensive with a cost of $10 to $30 per linear foot compared to $5 to $12 per linear foot for trenching. 

Depth is not a qualifying component of evacuation. Any human-made cut, cavity, or depression in the earth’s surface is considered excavation. The hole from excavation can be any size, shape, or depth. Excavation is used to create foundations, reservoirs, drainage ditches, and roads. Long, narrow excavations are called trenches and are often used for underground utilities.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

The Coffeeville, MS homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.