Top-rated basement remodelers.

Best basement remodelers near Villa Ridge, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Villa Ridge, MO?

Select your specific project to find the pro for you.

TRUSTED BY VILLA RIDGE, MO HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon16
    Verified basement remodels reviews

Top-Rated Basement remodelers in Villa Ridge - Updated Nov 2026

Avatar for Nonstop Basements
Nonstop Basements
5.0(
8
)
Basement - Remodel

Serving Villa Ridge, MO and surrounding areas

Approved

In business since 2022

Credit card accepted

At Nonstop Contracting, we transform ordinary basements into extraordinary living spaces built for modern life. As cutting-edge basement specialists, we combine innovative design, premium materials, and precision craftsmanship to deliver environments that elevate your entire home. From custom theaters and luxury bars to fitness studios, guest suites, and executive offices, every project is tailored to your lifestyle and built with long-term performance in mind. \n \nWe utilize advanced moisture-control systems, energy-efficient solutions, and meticulous finishing standards to ensure durability and comfort. Our team operates with transparency, organization, and nonstop communication from concept to completion. \n \nWe don?t believe in cookie-cutter remodels. We design intentional, high-end spaces that add value, function, and sophistication. \n \nNonstop Contracting ? engineering next-level basement living.

Full Basement Renovation
Full Basement Renovation
3 neighbors recently requested a quote
Avatar for The Designer Craftsmen
The Designer Craftsmen
5.0(
5
)
Basement - Remodel

Serving Villa Ridge, MO and surrounding areas

Approved

Free estimates

Small jobs welcome

Credit card accepted

Hello there! I'm a Saint Charles/Saint Louis native and an experienced carpenter and remodeller of 17 years! Been in my own business since 2022. I love to do beautiful work at reasonable prices. I am focused on design-minded small construction and carpentry--this means that I am not primarily so focused on flashy features and the newest updates, and more focused on how I can create a project with you that makes sense with your specific house and it's architectural design. I love working with wood the most but really love doing most anything on a home and happy to do handyman work here and there as well. Please reach out so we can start a conversation! I'm happy to offer advice on how to navigate the construction industry or send you phone numbers of other great guys if you need other services. I focus on approachability and a down to earth experience. I love doing good work, i'm easy to deal with and show up when I say I will. Would love to work with you!

Saint Charles Re-Deck
Saint Charles Re-Deck
Saint Charles Re-Deck
Saint Charles Re-Deck
Saint Charles Re-Deck

+25

Avatar for OV Development & Construction Group LLC
OV Development & Construction Group LLC
5.0(
2
)
Basement - Remodel

Serving Villa Ridge, MO and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"Great customer service they arrived on SAID time ON time. They didn't leave until the job was completed. I spotted one small flaw but nothing to complain about other than that they did a great job. They cleaned up behind themselves. I had to disposed of all the trash myself but they did put all the trash in bags and sat them outside nice and neat and it was also in the contract that the customer is responsible for disposal of trash. It was not a surprise. This properly why the cost was reasonably priced. I will use them again."
14 neighbors recently requested a quote
TNT Turnover Services
New to Angi
Basement - Remodel

Serving Villa Ridge, MO and surrounding areas

Approved

TNT Turnover Services isn’t just remodeling spaces—we’re transforming them.\n\nWe take outdated, worn, or underperforming areas and turn them into clean, modern, high-impact spaces built to impress and made to last. From kitchens and bathrooms to full property turnovers, our work is driven by precision, quality craftsmanship, and attention to every detail.\n\nAt TNT Turnover Services, we don’t believe in shortcuts—we believe in results. We bring reliability, speed, and professionalism to every project, delivering a smooth, hassle-free experience from start to finish. On time. On budget. Done right.\n\nWhether you’re upgrading your home or preparing a property for its next chapter, we’re here to raise the standard and exceed expectations.

Mueller Contracting LLC
New to Angi
Basement - Remodel

Serving Villa Ridge, MO and surrounding areas

Approved

Free estimates

Small jobs welcome

Offers commercial services

We are a small, family based company that provides excellent communication, and excellent work. We have a high attention to detail. We would be appreciative of your work. We have been in the construction industry for 20 years. We can provide select demolition, small structural demolition, and clean up services.

1 neighbors recently requested a quote
...
Showing 1-10 of 126
Basement Remodel FAQs, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

The Villa Ridge, MO homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.