Top-rated basement remodelers.

Best basement remodelers near Theodosia, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Theodosia, MO?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Theodosia - Updated Nov 2026

Avatar for Webster Construction
Webster Construction
New to Angi
Basement - Remodel

Serving Theodosia, MO and surrounding areas

Approved

Small jobs welcome

I’m a young outgoing individual, I’ve had a full time job since I was 14 trying every trade you can think of I have several years of plumbing under my belt, I’m a skilled framer, I’ve done electric for several years and even done mechanical work, I found a love and passion for handyman work and decided I was ready to take the leap on my own! If you need anything done no job is to big or small don’t be afraid to reach out I’d love to come check it out for you!!

Avatar for Anchor Contracting
Anchor Contracting
5.0(
6
)
Basement - Remodel

Serving Theodosia, MO and surrounding areas

In business since 1996

Free estimates

Credit card accepted

"Anchor Contracting came out immediately and gave me a very fair bid to redo a deck and siding that had been damaged by a fire and was unsafe. The work they did was excellent, the price was right and was done exactly on time. The owner, Sean Ichrist, was courteous and professional. After the work was completed, all areas were cleaned of debris. His bid and final bill were exactly the same. As a property manager of a large condo complex, it is wonderful to deal with the honesty and professionalism that Anchor Contracting and Sean bring to the job. I look forward to working with Anchor again."
Additional Photos
Additional Photos
Additional Photos
Before
After

+8

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Theodosia, MO and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 32
Basement Remodel FAQs, answered by experts

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

Yes. Renovating your basement has a return on investment (ROI) of 75%, meaning your remodel investment will significantly increase the value of your home. Besides the ROI, your family can enjoy a larger, more usable space while you live there. 

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

You technically can paint wires in a basement ceiling, but there are several important safety and code considerations. It's safe to paint non-metallic sheathed cable as long as the labeling remains visible. You can also paint low-voltage wires and conduit and junction boxes to help them blend into your basement. 

However, you should not paint damaged or deteriorated wiring is a fire hazard because it poses a fire hazard. The same goes for painting over high-heat wires that connect to heat-generating appliances or systems. Be sure to avoid painting multiple coats onto any wires, as that traps heat and poses fire risks.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Theodosia, MO homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.