Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Saint James, MO

Enter your ZIP and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Saint James, MO?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Saint James










Avatar for Sherwood Home Designs

Sherwood Home Designs

No reviews yet

Sherwood Home Designs

No reviews yet
19 years of experience

Sherwood Home Designs is your one-stop-shop for all your home needs. We are available for sub-contracting as well as estimates for private individuals. We accept all major credit cards, checks, and cash. Mention 'Angie's List' for a 15% discount on ANY job booked.

Sherwood Home Designs is your one-stop-shop for all your home needs. We are available for sub-contracting as well as estimates for private individuals. We accept all major credit cards, checks, and cash. Mention 'Angie's List' for a 15% discount on ANY job booked.

Showing 1-10 of 28
Epoxy Flooring questions, answered by experts

It takes about one to two days to remove carpet and install laminate flooring for small and medium-sized rooms. A larger room may take an extra day to complete. If you’re replacing flooring throughout your house, expect closer to one to two weeks, depending on your home’s square footage.

A laminate floor will lift if it hasn’t been installed with the proper expansion gaps around the room’s perimeter. Laminate flooring naturally expands and contracts when indoor temperatures fluctuate, and without adequate room for expansion, the planks can lift off the subfloor. To avoid this, ensure your flooring installer knows to leave the proper expansion gaps.

Yes, there are plenty of ways to lay stair carpet without grippers, such as carpet adhesive, magnetic flooring, or staples. Adhesive may be your best bet if you don’t want grippers, as it will most likely stick the best and cause the least amount of damage. However, if you’re looking for an easy fix, grippers are one of the best solutions you can purchase.

You can get away with stretching the carpet with some remaining items of furniture, so long as you have ready access to the parts of the carpet that require maintenance and you are not stretching through the furniture, as this leads to tears and fraying. Try to remove at least 50% of the furniture if you can’t remove it all.

Contractors commonly install floors before cabinets during a kitchen remodel. It’s the standard option when installing hardwood, vinyl, and tile flooring. Installing flooring first helps prevent height misalignment, ensures a seamless appearance, and saves extra flooring work and costs if you plan to replace or remove any cabinets later.

The Saint James, MO homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"