Top-rated sandblasting pros.

Get matched with top sandblasting pros in Lincoln, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your sandblasting service project in Lincoln, MO?

Select your specific project to find the pro for you.

Find Sandblasting pros in Lincoln

Avatar for Stanley's Home Improvement
Stanley's Home Improvement
3.3(
12
)
Exterior Surfaces - SandblastingExterior Surfaces - Sandblasting - For Business

Serving Lincoln, MO and surrounding areas

Free estimates

Emergency services offered

"It was apparent they were very skilled. They quickly dropped the huge limbs without a scratch on the house, fence or sheds surrounding the tree. They arrived on time and cleaned the area to my satisfaction before leaving. And they were competetively priced! I can't say enough good things about this company."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by77%of homeowners
Sandblasting Services questions, answered by experts

You can concrete can be done when it’s wet or dry. However, it’s safer when wet, as harmful dust and chemicals are present. Sanding it when dry is faster, but you’ll agitate more dust and chemicals, meaning you’ll need to be more careful.

If you’re DIYing the project, it could take up to a week if you aren’t able to dedicate full-time hours. If you hire a professional and they arrive with a team, expect your stairs to be sanded in as little as 2 hours (for simple projects). Finishing the stairs takes a while longer as there are drying and sealing times to consider, but the actual work will take much less time than the sanding portion.

Sand is a common sublayer for hardscape features like driveways, paver patios, and more. Most projects that involve sand require a 1-inch layer to promote evenness, drainage, and weight distribution. For further drainage, most projects have a 6-inch minimum layer of gravel beneath the sand. 

Because these two systems have different applications, there is no definitive answer to which is better. When working with sturdy materials, sandblasting is cheaper and faster, but more delicate projects require soda blasting. Before choosing either option, consider your specific needs, particularly your ultimate goal (cleaning, removing rust, prepping for painting, etc.), the material, and your budget.

Your pro will most likely bill you at an hourly rate of $50 to $80 per hour to sandblast a door due to its small size. This type of job won't take long, so if you have other surfaces that need cleaning, schedule those tasks at the same time to get your money's worth from your pro's visit.

The Lincoln, MO homeowners’ guide to sandblasting services

From average costs to expert advice, get all the answers you need to get your job done.