Top-rated rototilling pros.

Get matched with top rototilling pros in Bevier, MO

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Bevier, MO?

Select your specific project to find the pro for you.

Find Rototilling pros in Bevier


"Contracted HomePro to build a sunroom and install siding. Signed contract about Labor Day. After several " trips to measure:" work finaly started the week before Christmas. Never knew who would show up as there was 2 crews working. Salesman kept coming by to collect money even though contract called for payment at completion. Owner came out at completion and made several promises that were never fulfilled. Job was shoddy and less than professional. On completion found several contractors that could have done the job cheaper (our fault). If interested in HomePro investigate them completely."

Jim S on August 2025

We sell and install exterior building materials from ground to rooftop. We also do custom design work for home and yard, turn your backyard into a show stopping oasis

"Contracted HomePro to build a sunroom and install siding. Signed contract about Labor Day. After several " trips to measure:" work finaly started the week before Christmas. Never knew who would show up as there was 2 crews working. Salesman kept coming by to collect money even though contract called for payment at completion. Owner came out at completion and made several promises that were never fulfilled. Job was shoddy and less than professional. On completion found several contractors that could have done the job cheaper (our fault). If interested in HomePro investigate them completely."

Jim S on August 2025


Ruhl and Son Construction & Excavation

110 Alan Drive
5.00(
1
)

Ruhl and Son Construction & Excavation

110 Alan Drive
5.00(
1
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

We are a full service Construction Company, We have been doing business in the St. Louis Area for over 100 years. We are small, but we like being small that way we can give a better service to our customers.

We are a full service Construction Company, We have been doing business in the St. Louis Area for over 100 years. We are small, but we like being small that way we can give a better service to our customers.

Rototilling questions, answered by experts

Pros will assess your soil type, property geography, and rain patterns for optimal slope.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Yes, it’s always a good idea to fertilize your lawn before a major leveling project. This step gives your grass the nutrients necessary for healthy growth, helping it recover and replenish itself faster. However, you should do this at least three weeks in advance, as the leveling process can disturb the newly-applied fertilizer.

For minor unevenness, you don't necessarily need to remove grass before leveling. You can apply a topdressing mixture to fill in low areas and even out the surface. However, for more significant unevenness or deep depressions, it might be necessary to temporarily remove the grass to ensure proper leveling and soil compaction. After filling and leveling, you can replace the grass or consider reseeding the area.

Improved drainage, garden aesthetics, and protection from moisture damage.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"