Top-rated excavation pros.

Get matched with top excavation pros in Underwood, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Underwood, MN?

Select your specific project to find the pro for you.

Find Excavation pros in Underwood

Hedstrom Excavating
New to Angi
Landscape - Minor Grading or Resloping

Serving Underwood, MN and surrounding areas

Approved

In business since 2021

Emergency services offered

Small jobs welcome

At Hedstrom Excavating, LLC we are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We have many years of experience to give you confidence that we are your number one choice for your next home project. You will find us to be competitively priced with close attention to the details. We look forward to building a lasting relationship and guarantee your satisfaction!\n

Response time1 day
Showing 1-10 of 28
Excavating questions, answered by experts

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

It can take several weeks for the ground to settle after removing a tree, and the soil under larger, more mature trees can take months. The deeper the tree has been ground under the soil, the longer it will take to settle. However, this extra depth can help you plant new landscaping sooner because you’ll have more space for fresh soil.

Depending on the severity of the freeze and the method used, thawing frozen underground pipes can take anywhere from 30 minutes to several hours. Applying heat directly to the pipe using heat tape, infrared lamps, or hot water jetting can speed up the process. However, patience and careful monitoring are key to avoiding pipe damage.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Yes, professional installations include trenching or borehole drilling required for ground loops.

The Underwood, MN homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.