Top-rated basement remodelers.

Get matched with top basement remodelers in Hibbing, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Hibbing, MN?

Select your specific project to find the pro for you.

Find Basement remodelers in Hibbing

Avatar for Marshall Handyman Services
Marshall Handyman Services
4.1(
51
)
Basement - Remodel

Serving Hibbing, MN and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"Dave Marshall showed up on Tuesday morning to see what I needed done. He called me with an estimate that afternoon. The guys showed up to work at 10 a.m. on Wednesday morning and were done that afternoon.
The dirt pile was spread over bare spots in the yard. The bigger garden had trees growing in it. They were cut out and the railroad ties moved to where I had asked. The smaller 2 tiered garden was buried under a large pile of retaining wall blocks. The blocks  were neatly stacked where I asked them to be and the garden demolished. All of the areas were down to grade with the rest of the lawn so I can easily seed it and mow it. They even cut the weeds and long grass that was there too. They worked fast and did a fantastic job. I will definitely hire them again.


"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by94%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Hibbing, MN and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for B&M Residential Services
B&M Residential Services
5.0(
1
)
Basement - Remodel

Serving Hibbing, MN and surrounding areas

In business since 2017

Free estimates

Emergency services offered

B&M Residential Services, is your very best option for all your home improvement needs. We always offer the very best pricing, excellent customer service and superior workmanship on every job we do. Call us now!

bathroom
Bath
Bathroom
Bath Remodel
Bathroom

+25

Response time1 day
TM Constructors
5.0(
1
)
Basement - Remodel

Serving Hibbing, MN and surrounding areas

In business since 1972

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent customer service from start to completion of a project. To understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a personal and professional manner. Our reputation is based on service, safety and quality, regardless of how large or small the job.

Recommended by100%of homeowners
Showing 1-10 of 15
Basement Remodel questions, answered by experts

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Walkout basements cost more than other kinds of basements, and can also increase your risk of leaks as well as a loss of insulation, leading to higher heating and cooling costs. Improperly installed walkout basements may lead to structural issues with your foundation, so ensure you’re working with a contractor who has extensive experience with this kind of basement.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

If you’re not sure which method of raising the ceiling is best for you, here are a couple of considerations to help you make that decision. A professional ceiling company will be able to help you determine the best option for your home.

  • How long you are planning to live there: although raising the basement ceiling will increase the value of your home, if you’re planning to sell the house, then go for raising the house.

  • The condition of the foundation: to lower the floors, your foundation has to be intact whereas raising the house will allow you to restore the damaged foundation.

The Hibbing, MN homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.