Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Garrison, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Garrison, MN?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Garrison

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Garrison, MN and surrounding areas

In business since 1971

Credit card accepted

"AHS is ok. They cover repairs of most everything under the roof of your house. The companies that contract with them are not always the best. You call AHS with the issue, they send a fax to the repair company and give you the contact info. If they don't contact you within 24 hours, you call them. Sometimes they answer, sometimes they don't. When they arrive (usually three days or so later), they service the item. if it has issues within the 90 days, you call AHS again, they are sent out with no charge. If the serviceman decides the unit is unrepairable, AHS will allow you to choose a replacement from their listing (usually not as good as what you have) they will install and remove your old item, or give you wholesale amount to buy and install your own. Prices vary on what you want covered and what you want the copay to be, plus where you live. For me it is 49.99 per month with a 75.00 time of service order. You can have more than one item serviced at the same time under the same fee. If you have a SEAR product the repair guys are great. Not that wild about the other ones they send out. But it is a big savings compared to calling someone on your own. The cost of service is only the 75.00 copay."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Frank Haydon
2.8(
5
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Garrison, MN and surrounding areas

In business since 1991

Free estimates

Emergency services offered

"Frank was very knowledgeable. He did an excellent job with the pool, pricing was more than fair and he was always making sure I was happy with the way things were going throughout the entire process. I would recommend him again any day and I will be brining him back again when I add more upgrades to the pool room."
Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

Certain pools serve as a middle ground between traditional swimming pools and hot tubs. The two main options are plunge pools and swim spas. A plunge pool (or cocktail pool) is smaller, but you can add spa-like elements such as heating and jets. A swim spa is more similar to a hot tub, but it produces a current that allows you to swim in place (similar to how a treadmill lets you run in place). 

Draining a pool with a garden hose can take between eight and 14 hours depending on the depth of your pool and whether you use a sump pump. Be sure to stay close to the pool during this time to ensure the structure of your pool remains unharmed and that the water drains properly.

If you put too much chlorine in your pool, it can make the pH level more acidic, creating a health risk. You might experience symptoms like nausea, dizziness, vomiting, skin rashes, and irritation in the eyes, nose, throat, and lungs. To lower the chlorine level, you can turn off your chlorinator or chlorine feeder, add more water to dilute the pool, or remove the cover to let sunlight naturally reduce the chlorine.

Your contractor will need several days to several weeks as far as a timeline to install your semi-inground pool goes. Adapting an aboveground pool to be semi-inground by excavating and partially burying the liner, for example, will only take three to five days, while installing an in-ground pool with a poured concrete liner and building up the land around it will require several weeks. Keep in mind that the process of hiring a pool contractor and applying for permits can add several additional weeks to the total timeline.

Your pool should only lose around 1/4 of an inch of water per day, give or take. More wind, sunlight, and heat will cause this number to increase, while rainy or cloudy days will decrease the amount of water that evaporates.

The Garrison, MN homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.