Top-rated solar panel pros.

Get matched with top solar panel pros in Saugatuck, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Saugatuck, MI?

Select your specific project to find the pro for you.

Find Solar panel pros in Saugatuck

Avatar for CUSTOM HOME SERVICES
CUSTOM HOME SERVICES
4.8(
6
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving Saugatuck, MI and surrounding areas

In business since 2012

Free estimates

Credit card accepted

"The technicians did a great job on the installation of the solar panels and the equipment that goes along with the panels. They were total professionals! They were also instrumental in getting everything up and running the way it should. Custom Home Service did a great job taking care of the details, and always had time for any of our questions. They did a great job!!"
Recommended by100%of homeowners
Avatar for Vander Hyde
Vander Hyde
4.3(
363
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+5 more

Serving Saugatuck, MI and surrounding areas

In business since 1989

Free estimates

Emergency services offered

"Excellent service, to say the least!  I ordered a 20kW Generac generator from a nationwide distributor and had it shipped directly to my location.  I poured the concrete pad myself, and bolted the generator down.  While somewhat proficient with electrical wiring, I did not trust that I could do this job without issue.  I contacted VanderHyde (they were listed as the primary West Michigan Generac Dealer) and asked if they could do the wiring for me.  Ryan Hyde came out for the quote and spent nearly two hours at my house talking about the transfer switch.  Generac provided a 200 amp switch, but my house was wired for 150.  We agreed that I would give them my 200 amp automatic transfer switch, and they would order a 150 amp switch as a replacement......and I would cover the split cost.....essentially adding $360 on to my bill.  I was fine with that.  Jason did the install on 11-16-2012 and spent 8.5 hours outside.  One trip to Lowes/Home Depot was needed for additional parts to tie into the existing power meter.  A great guy - I asked numerous questions and he explained what he was doing as he worked.  Once done, he came inside and asked if I wanted to be present for the "firing up" up the generator.  Overall the price was a bit high, but I also understand that I did not purchase the generator from them.  I was able to get the generator new for a little over $5000 online, which resulted in a large overall cost savings....so I expected to pay a bit more for the work I did not feel confident in doing myself.  I felt they did an amazing job and I would gladly call them again as needed for additional electrical work.  One a side note, I lost my original installation paperwork in a basement flood two years ago.  I called the company and had a copy of all paperwork in my email inbox in less than five minutes.  NICE!  Please note:  This review will be listed under "water softeners" and I cannot find a way to change it!
"
Recommended by81%of homeowners
Showing 1-10 of 16
Solar Panels questions, answered by experts

The morning sun can be better for solar panels because it’s often brighter and clearer than the afternoon sun. The brighter the sun, the more energy solar panels produce. The strongest rays occur during midday, which tends to be prime time for solar energy generation. Most homes get a mix of morning and afternoon sunlight.

Yes, you should tell your home insurance company about your solar panels. Even if you believe they’re covered by your existing policy, installing a solar panel system is a significant change to your home. This can affect coverage and premiums. By discussing your new solar panel installation with your insurance provider, you can be sure you have enough coverage and that the policy completely covers the panels against damage.

In almost every case, solar panels need to be removed to replace roof shingles. In some cases, such as solar installations where the panels are on raised platforms above the roof surface, installers may be able to install new shingles without removing the solar installation. However, to get a quality roofing installation, panels need to come off. Most roofing contractors won’t remove or reinstall solar panels as part of a roofing project, so you’ll need to contact your solar provider.

In most states, solar installers need to be licensed and insured as solar professionals, although some states don’t have specific requirements for installers. You can use our state licensing tool to check if an installer you’re considering hiring holds the proper licensing. No matter where you live, a member of your solar panel installation company must be a certified electrician to connect your panels to your home and the electric grid.

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

The Saugatuck, MI homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.