Top-rated basement remodelers.

Get matched with top basement remodelers in Onaway, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Onaway, MI?

Select your specific project to find the pro for you.

Find Basement remodelers in Onaway

Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Onaway, MI and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for JPR Builders Inc. - Petoskey, Michigan  Facebook
JPR Builders Inc. - Petoskey, Michigan Facebook
5.0(
2
)

Serving Onaway, MI and surrounding areas

In business since 1992

Free estimates

At JPR Builders, Inc., we sustain our business on quality and integrity. We are experts in our trade and our commitment to quality shows from beginning to end of your project. We look forward to earning your business. Call us today!

View of the lake
Breathtaking great room
Master Bathroom suite
Great room/open floor plan in basement
Wet bar in basement

+9

Recommended by100%of homeowners
Avatar for Destination Home Builders
Destination Home Builders
3.7(
3
)

Serving Onaway, MI and surrounding areas

In business since 2021

Emergency services offered

Credit card accepted

"Joel and his team did a great job. Arrived on time, were diligent in their work and paid attention to the details. They stuck right with the project until completion. At the end Joel took the time to review everything to make sure it finished as expected. Well done. And I already have more work lined up for Joel and his team."
South Boardman Post Office
South Boardman Post Office
South Boardman Post Office
South Boardman Post Office
South Boardman Post Office

+17

Response time4 days
Response rate100%
Recommended by33%of homeowners
Skiba Heating
0.0(
1
)

Serving Onaway, MI and surrounding areas

In business since 1988

We are the guys that pay great attention to the details.The son of a master carpenter and general contractor I have served customers in Northern Michigan for well over 25 years in the construction industry. At All American we are able to handle various size projects through the coordinated effort of our crew and our excellent sub-contractors. Heating and air conditioning has always been a specialty area for us and that is why the E mail is so set-up, since that is where the emergency calls are generated ,especially here in the North. Your satisfaction and comfort are our primary concerns.\nPatrick Skiba-Owner,mgr,worker

TJ’s Estate Property management
New to Angi

Serving Onaway, MI and surrounding areas

I am a true Jack of all trades! If it was worth doing, it’s worth making sure it was done correctly. Quality takes second place to nothing. Areas I though roughly enjoy are custom projects. I am here to see that your dreams become reality. No matter what your expectations and standards are, I always strive to go above and beyond what’s required. I over think absolutely everything making sure no matter the project, that we don’t have to go backwards. My time is valuable and you worked hard for the money you will spend. I won’t waist either.

Bayside Contractors Group, LLP
New to Angi

Serving Onaway, MI and surrounding areas

In business since 1973

Bayside Contractors has been in the business since 1973; that's over thirty years in the industry beautifying customer�s homes, where quality is our passion. We provide the best customer service in the industry. We have a financing division in house, so you don't have to shop around. If you are looking for an excellent professional and quality contracting company who prides themselves in exceptional customer service, give Bayside Contractors Group a call today. We look forward to building a lasting relationship with you and making all your home improvement needs come true!

Showing 1-10 of 12
Basement Remodel questions, answered by experts

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

You can paint your ceiling or install a drywall ceiling if the ceiling is unfinished, as they take up less headroom than drop ceilings. 

If there are pipes in the way of ceiling installation, you can do one of two things: reroute the pipes or adjust the installation to fit, which will cost extra.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

The Onaway, MI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.