Top-rated basement remodelers.

Get matched with top basement remodelers in Roseland, LA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Roseland, LA?

Select your specific project to find the pro for you.

Find Basement remodelers in Roseland

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Roseland, LA and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Tujays Construction, Inc.
Tujays Construction, Inc.
4.7(
3
)
Basement - Remodel

Serving Roseland, LA and surrounding areas

In business since 1990

Free estimates

Warranties offered

"Mr Joe contacted us and set an appointment immediately.We met ,he explained our job requirements and offered us to look at prodcuts on our own .This way we knew when he gave an estimated of the job it was a fair price.We were not ready for the job immediately but he will 9 out of 10 be the person doing the job. Do to is honesty and understanding of our time needs."
At the beginning
First, remove the patio
This is an on ground deck
Cauthren
 Then the foundation

+8

Recommended by100%of homeowners
Pinnacle Contracting Concepts, LLC
1.0(
6
)
Basement - Remodel

Serving Roseland, LA and surrounding areas

In business since 1997

Pinnacle Contracting Concepts, LLC is a full service remodeling company striving for customer satisfaction at all times. Whether your remodeling your first Condo or adding a suite to your fourth Castle, with over 22 years of combined experience, we can help! We generate mostly refferal based leads which is a testament to our excellant quality and service. Our approach is as if every job is another chance for us to help you Rebuild your Dreams!! Give us a call for a free consultation!!\nPinnacle has also become a large force in helping our countries Hurricane victims in the Gulf Coast. With crews in 3 of the Gulf Coast States, we are offering Debris clean-up, Demolition, and Construction Services. Our goal is to help get our neighbors back into their homes as soon as possible.

 1
 1
 1
 1
 1

+26

Showing 1-10 of 24
Basement Remodel questions, answered by experts

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

Key trends include home gyms, theatre rooms, additional rooms (bedroom/office), and more, with personalized styles reflecting individual preferences.

Making a window in a basement larger costs an average of $4,200. You’ll need to pay an average of $550 to have a structural engineer plan the project, $500 to $1,500 for the installation labor, and an average of $2,200 for the excavation and window well installation. The remainder will go toward pulling permits, installing trim, and repairing drywall on the interior.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Roseland, LA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.