Top-rated rototilling pros.

Get matched with top rototilling pros in Mcdowell, KY

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Mcdowell, KY?

Select your specific project to find the pro for you.

Find Rototilling pros in Mcdowell

Avatar for L & C Mower Parts

L & C Mower Parts

No reviews yet

L & C Mower Parts

No reviews yet
16 years of experience

L & C is a family operated small business in the industry of outdoor power equipment sales and service. We service most makes of 2 & 4 stroke gas powered lawn mowers, chain saws, grass trimmers, etc. We also service propane powered equipment in the outdoor power industry. L & C has a minimum of TWO master certified technicians on duty

L & C is a family operated small business in the industry of outdoor power equipment sales and service. We service most makes of 2 & 4 stroke gas powered lawn mowers, chain saws, grass trimmers, etc. We also service propane powered equipment in the outdoor power industry. L & C has a minimum of TWO master certified technicians on duty


Rototilling questions, answered by experts

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

Yes, you can rent a rototiller for around $60 per day and do the work yourself, but it’s not recommended. Tilling is more of an art than a science, as tilling too deep can be detrimental to your soil structure and the organic matter that is beneficial to plants and shrubs, and tilling too shallow won’t properly introduce fertilizer or break up the soil for rooting plants. Additionally, tillers are powerful machines with sharp blades to cut through small roots and soil, so they are inherently dangerous to use. It’s usually worth it to hire a professional rototiller.

Yes, most services include grading for proper drainage. Confirm with your contractor.

When leveling the ground for a pool. If the ground is mostly level, you may be able to simply lay down pavers or pool pads to support the pool. However, you’ll still need to level the ground with sand as a base before adding other materials on top, like crushed gravel.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.