Top-rated basement remodelers.

Best basement remodelers near Livermore, KY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Livermore, KY?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Livermore - Updated Nov 2026

Daniel Wallace
New to Angi
Basement - Remodel

Serving Livermore, KY and surrounding areas

Approved

I’m a hardworking person who doesn’t like to leave projects half finished or looking sloppy, I can be a bit of a perfectionist. I’ve always fixed and built almost everything I needed myself and I take pride in being self sufficient. I’ve been an electrician for a year and half now and before that I was fabricating aerators for private residences. I have a wife and two children, so I can handle the chaos of a whole house remodel even if you decide to alter any details halfway through.

Avatar for Elite Installation Services LLC
Elite Installation Services LLC
4.5(
8
)
Basement - Remodel

Serving Livermore, KY and surrounding areas

In business since 2013

Free estimates

Warranties offered

"The installation crew was awesome. They were very professional and friendly. The installers took pride in their work. They insured that all 19 windows were installed properly and left a clean work site. I recommend Elite installation Services."
Simon Project
Simon Project
Simon Project
Simon Project
Simon Project

+30

Recommended by87%of homeowners
Avatar for Potter House Group Inc
Potter House Group Inc
4.4(
12
)
Basement - Remodel

Serving Livermore, KY and surrounding areas

In business since 2003

Emergency services offered

Credit card accepted

"For the second time we are so pleased with our recent contract with Potter House Group.  Our first experience with Potter House Group was a new build construction project.  They found us a lot and built us a custom home about 9 years ago.  Since then we relocated into a 115 year old home and we hired them for our kitchen remodel.  First we did our research, and we sought bids from several contractors.  Potter House Group once again had a competitive quote, that we felt had all the "bases" and potential "surprises" covered.  We also felt that the allowances that were allotted in our estimate allowed us to select quality selections for the fixtures, granite, cabinetry & flooring.  What impressed us the most is that once again we worked directly with the owner, Lee, for the duration of the project.  From the very beginning, Lee was professional, honest, and extremely efficient with our time.  Our kitchen was completely gutted down to the bare studs, removing of walls, flooring, electric, and a back staircase.  When you are without the hub of your home-the kitchen-meeting timelines is very important.   They met all timelines and brought in the necessary resources and tradesmen to perform various scopes of work.  All the inspections that were needed went well too.  Lee addressed any questions or concerns we had during the process responsively.  Without a doubt, Potter House Group will be the contactor we use for the next job.  We are already dreaming of our next project, a master bath addition.  Can?t wait!  Potter House Group is highly recommended!!!
Thank you Lee for a beautiful kitchen!"
Additional Photos
Additional Photos
Additional Photos
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Livermore, KY and surrounding areas

In business since 2006

Credit card accepted

"I feel extremely fortunate to have found Vicki through Angie's List !  She is an extremely talented person who is very easy to deal with. She has a breath of knowledge that allows her to accommodate my tastes, but also ensure that the overall design is in sync with the design and location of my home.  She has  a very diplomatic way of suggesting when I'm going astray with my choices and in every case where she has told me "Trust Me"  I have been delighted ! She is very aggressive in helping me find the best pricing and often times will work with the vendors directly  hence saving me the time.  She also has excellent local contacts.  Everyone I've worked with through Vicki has been timely, professional, and highly competent.
My project is far from complete.  I intend to continue to use Vicki and her expert advice until the end !!!!"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Restored 77
Restored 77
4.8(
4
)
Basement - Remodel

Serving Livermore, KY and surrounding areas

In business since 2013

Free estimates

Emergency services offered

"Everything went as planned. There were here at 8 everyday and some Saturdays when it worked out for us. Juan is easy to work with. This is my second time using them and would definitely use them again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+37

Recommended by100%of homeowners
Showing 1-10 of 33
Basement Remodel FAQs, answered by experts

While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.

A finished basement does not always count as square footage, as this varies by state regulations. In areas that allow below-grade spaces to be included in a home's official square footage, the basement must typically meet certain conditions. These conditions often include having a functional egress and being a livable space with flooring, finished walls, and temperature control. To be certain, contact your local assessor to confirm your area's specific policies regarding basement square footage.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Joists and beams are both part of the flooring system above your basement, with the beams spanning the length of your home and getting support from vertical posts underneath, and joists usually spanning half the width of your home with no support posts underneath. The floor joists provide even support to the subflooring and flooring above, and they distribute that load to the beams. The beams then distribute that load down through the support posts to the foundation.

Anything having to do with the structure of your home, such as raising the ceiling, is usually the most expensive part of finishing a basement. Another project component that could be a surprisingly high expense is adding an exterior entrance. 

The cost of a walkout basement can be anywhere from $5,000 to $35,000.

The Livermore, KY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.