Top-rated rototilling pros.

Get matched with top rototilling pros in Fowler, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Fowler, KS?

Select your specific project to find the pro for you.

Find Rototilling pros in Fowler



DOWNEY LAWN & LANDSCAPE

2.00(
3
)

DOWNEY LAWN & LANDSCAPE

2.00(
3
)
31 years of experience

In business over 20 years. Areas number 1 volume sod installation company. Sod, sprinkler systems, water features, fire features, patios, decks, pergolas, athletic fields, and much more!

In business over 20 years. Areas number 1 volume sod installation company. Sod, sprinkler systems, water features, fire features, patios, decks, pergolas, athletic fields, and much more!

Rototilling questions, answered by experts

When leveling the ground for a pool. If the ground is mostly level, you may be able to simply lay down pavers or pool pads to support the pool. However, you’ll still need to level the ground with sand as a base before adding other materials on top, like crushed gravel.

You should exercise care when deciding how to landscape over a leach field for your septic system. You typically want lightweight materials that won’t damage the drain field’s perforated pipes. When adding plants to the area, select plants with shallow roots, such as grass or flower gardens. Trees with deep roots could damage the pipes in the field.

Grading refers to the sloping of your yard away from your house’s foundation. It’s a landscaping term you probably know well if you’ve ever had to push your lawn mower up a steep slope.

Leveling is the solution to grading issues since it involves making your yard flat and smooth (and easy to push a lawn mower through).

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.