Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Oaktown, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Oaktown, IN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Oaktown

...
Showing 1-10 of 53
Asphalt Driveways questions, answered by experts

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

When comparing installation costs, asphalt is often less expensive upfront than concrete. Asphalt prices typically range from $7 to $15 per square foot, while concrete can range from $3 to $18 per square foot. However, long-term costs should also be considered. Concrete driveways generally last longer (up to twice as long) and require less maintenance, which can make them more affordable over their lifespan. While asphalt has a lower installation cost and is easier to repair, it requires more frequent maintenance, such as sealing, which can add up over time. Therefore, while concrete is more expensive initially, its durability may offset the cost in the long run.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Oaktown, IN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.