Top-rated rototilling pros.

Get matched with top rototilling pros in Akron, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Akron, IN?

Select your specific project to find the pro for you.

Find Rototilling pros in Akron


Avatar for Mainstream Works

Mainstream Works

No reviews yet

Mainstream Works

No reviews yet
14 years of experience

Mainstream Works will work as an independent contractor for all services performed. With over 30 years of experience in home building, remodeling, landscaping, and construction, Mainstream Works guarantees a successful project.

Mainstream Works will work as an independent contractor for all services performed. With over 30 years of experience in home building, remodeling, landscaping, and construction, Mainstream Works guarantees a successful project.


Rototilling questions, answered by experts

People level their yards for practical and cosmetic purposes. If you have a very steep slope in your backyard, you might have a hard time with lawn maintenance. Or, if you want to entertain in the summer but don’t have a flat yard, building a patio would be quite difficult.

Not typically. A paver patio drainage problem generally requires a landscaping fix that can include a drainage pipe or dry well capable of handling the amount of runoff in your yard.

Yes, rain can affect the results of a perc test because it will partially saturate the soil and slow down the rate of drainage. Ideally, you should do a perc test during the driest time of the year and try to schedule it after a stretch of days where no precipitation occurs. This will give you the best chance of passing.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.