Top-rated basement remodelers.

Best basement remodelers near Chillicothe, IL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Chillicothe, IL?

Select your specific project to find the pro for you.

TRUSTED BY CHILLICOTHE, IL HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon22
    Verified basement remodels reviews

Top-Rated Basement remodelers in Chillicothe - Updated Nov 2026

Avatar for Exclusive Masonry & Construction
Exclusive Masonry & Construction
5.0(
3
)
Basement - Remodel

Serving Chillicothe, IL and surrounding areas

Approved

Free estimates

Small jobs welcome

Offers commercial services

"Communication was great ever step of the way and they were more than flexible and worked through challenging weather to get the job done within our time frame. Would def consider working with them again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+43

2 neighbors recently requested a quote
Spittler Construction
New to Angi
Basement - Remodel

Serving Chillicothe, IL and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

I have been in some form of construction most of my adult life. And recently have started turning it into a business for myself. From grading to excavating work to remodel projects we can handle it. We are based in Hennepin and work all over the Illinois Valley. We pride ourselves on being prompt, upfront and honest with our customers to give the customer the best experience possible. \n\n24 hour emergency service available

Rental House Repairs
Rental House Repairs
Rental House Repairs
Rental House Repairs
Bar Build

+7

2 neighbors recently requested a quote
Avatar for Kitchen & Bath Specialties
Kitchen & Bath Specialties
4.7(
146
)
Basement - Remodel

Serving Chillicothe, IL and surrounding areas

In business since 1985

Free estimates

"The remodel went great. Joe and his crew were friendly and prompt. They did the work in a timely fashion and were very good at communicating about the project. They did an amazing job transforming our bathroom. They replaced a vanity, walls, put in a tub and tiled. They also laid vinyl flooring and installed lights. We were impressed and thrilled with how quickly they worked and with the finished project. We would hire them again for another renovation. Please check them out."
Kitchen 1
Kitchen 2
Kitchen 3
Beautiful Tile
Additional Photos

+5

Recommended by92%of homeowners
Avatar for Milliman and Sons Builders
Milliman and Sons Builders
5.0(
15
)
Basement - Remodel

Serving Chillicothe, IL and surrounding areas

In business since 1974

Free estimates

Emergency services offered

"Charles came out and did the work. Found him from this site. He was on time, professional, neat, worked the entire time, and friendly. There were no suprises. I would hire him again to do all my work, even remodels and additions. I trust his advice and like his work ethic."
Composite Dock with steps
Black Bamboo Flooring
Dormer Siding Repair (After)
Composite Dock
Dormer Siding Repair(before)

+43

Response time10 mins
Response rate100%
Recommended by100%of homeowners
Avatar for Illinois Remodeling Consultants
Illinois Remodeling Consultants
4.2(
18
)
Basement - Remodel

Serving Chillicothe, IL and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"Great company! Very professional. When my basement flooded they came in and made this stress free for me and handled everything in a timely matter. My basement looks great now and I couldn't be happier. I highly recommend."
Small Bathroom Remodel - After
Hardwood Flooring - Pekin IL
Remodeling - Kitchen & Bathroom Project
Solar Panels Project
Custom Tile with a Bench

+136

Recommended by86%of homeowners
Avatar for Ace Interiors Construction and Maintenance
Ace Interiors Construction and Maintenance
5.0(
5
)
Basement - Remodel

Serving Chillicothe, IL and surrounding areas

In business since 2005

Free estimates

"I purchased an old home that needed extensive work, particularly flooring. Two rooms downstairs and the entire upstairs needed all new floors, some with remediation of sub surfaces. All the work was done beautifully, on time, and on budget."
Framing up walls
Framing up walls
Framing up walls
Framing up walls
Framing up walls

+46

Recommended by100%of homeowners
Avatar for Bath Time by Troy Crilly
Bath Time by Troy Crilly
4.7(
14
)
Basement - Remodel

Serving Chillicothe, IL and surrounding areas

In business since 1990

Free estimates

Small jobs welcome

"These guys are good. Made minimal mess, considering the kitchen renovation that they did. Very respectful of my needs to keep a realistic budget and kept me informed and updated. Troy made some great suggestions in the beginning which I am so glad I went with. Highly recommend and worth waiting for!"
Virginia
Bathroom
Virginia
Virginia
Whirlpool tub with walk in shower

+66

Response time2 days
Recommended by100%of homeowners
...
Showing 1-10 of 65
Basement Remodel FAQs, answered by experts

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

Basements are commonly converted into game rooms. The potential challenges you may run into include controlling moisture, working with low ceilings, limited natural light, and the need for additional electrical or HVAC work. Addressing these issues can add to the total cost, but it ensures a comfortable and functional space.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Adding an extension or addition to your home costs more than a loft conversion in all but the rarest cases where the home's structural integrity is lacking. Because a home addition requires a new foundation section or significant structural upgrades to handle a cantilevered portion, the cost compared to almost any loft conversion is significantly greater for the same square footage.

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

The Chillicothe, IL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.