Top-rated gas log pros.

Get matched with top gas log pros in Carmi, IL

There are 0 highly-rated local gas log pros.

Need a pro for your gas log service project in Carmi, IL?

Select your specific project to find the pro for you.

Find Gas log pros in Carmi


Schuetz Companies LLC

4464 E Radio Tower Ln
No reviews yet

Schuetz Companies LLC

4464 E Radio Tower Ln
No reviews yet
29 years of experience

We are a family owned business with ten (10) full-time and (2) two part-time employees. Some of our specialties are painting, HVAC, electrical, ceramic tile, bath and kitchen remodeling, windows, doors, hardwood flooring, complicated wood details, etc.

We are a family owned business with ten (10) full-time and (2) two part-time employees. Some of our specialties are painting, HVAC, electrical, ceramic tile, bath and kitchen remodeling, windows, doors, hardwood flooring, complicated wood details, etc.

Gas Logs questions, answered by experts

If you're connecting your gas line to appliances, the pro doing the work may recommend flexible corrugated stainless-steel tubing (CCST). Polyvinyl chloride (PVC) with high-density polyethylene (HDPE) is another relatively inexpensive material commonly used for residential pipes. Ultimately, you'll need to find out what is permitted based on the code requirements in your area.

Yes, it’s possible to cap a gas line yourself if you’re no longer using it or are simply going out of town for an extended period of time. It’s essential to follow the steps on properly capping a gas line yourself. If you’re uncomfortable with any of the steps, you may want to bring in a natural gas plumber for added reassurance.

Installing a gas line is no simple task. From start to finish, you’re looking at anywhere from six to 12 weeks to acquire the correct permits, dig a trench, and connect your appliances. Naturally, the longer the gas line, the longer it will take to complete. If your plumber needs to hire additional contractors to dig trenches and navigate around or remove obstacles, this could put you at the longer end of the timeframe. 

Once the land is prepped and licenses acquired, installing the actual line may only take a few days to a few weeks, weather permitting.

Call 811 to locate and mark the gas lines at least three days before digging. In many areas, you can dig within 18 inches of the lines, though in some locations, the distance may be further. Check local regulations, as you may need a utility company representative onsite when digging. Document your calls to 811 and precautions taken to avoid gas lines. A homeowner can be held liable for hitting a gas line in some cases, but contacting the proper authorities and following all guidelines can offer protection.

The easiest way to empty a propane tank is to simply use it until no propane remains. If you’re short on time and need a faster solution, transfer the propane to another tank instead. Wear leather gloves to protect your hands, then connect the hoses from both propane tanks and seal them tightly. Turn the knob to open the supply tank valve on the full tank and let it run until the pressure pushes all the propane into the other tank. When all propane is transferred, remove the hose and seal each tank. 

By submitting this question, I acknowledge and agree that Angi may publicly display my name, city, state, and question on the website for professionals and others to see.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.