Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Brookport, IL

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Brookport, IL?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Brookport

Avatar for Green Earth Enterprises Inc
Green Earth Enterprises Inc
4.7(
7
)

Serving Brookport, IL and surrounding areas

In business since 2009

Free estimates

Emergency services offered

"I hired the company to do a make ready [clean up & prep] on a single apartment in a building which I own in the  town where I live. I needed the property to be cleaned up so I could rent it again.  I have been a landlord for over 20 years & hadn't found a vacated property in such a mess in all my years. They did the complete interior clean-up which took about five hours. And, the complete prep of the property. they took out all the trash & junk, and cleaned up all debris left in the yard. They did such a great job with that I decided to use them for the yard maintenance also. They cleaned all my flowerbeds & got them ready for spring, placed mulch & trimmed the shrubs and flowering trees. On the inside they made everything look brand new! Cleaning the walls, painting, cleaned the carpets & stripped & polished the wood floors...making them look brand new. The appliances that stayed were cleaned inside & out. They even remembered to get all the light fixtures clean for me. Dusted all window seals & doorways. Shine mopped all they tile floors. To top it all off they even gave the bathrooms a fresh clean look by putting a new caulk seal around the tubs, sinks & shower...which gave the bathrooms a fresh face. All in all I found it to be a very stress free pleasant experience. And, I will definitely call on them for the next project because if they could do so well with a nightmare like that I'm sure the less difficult will be equally affordable and easily handled. Everything just looked so nice when they were finished. Thanks, Green Earth
"
Recommended by71%of homeowners
Precision Landscape & Remodeling
3.7(
13
)

Serving Brookport, IL and surrounding areas

In business since 2012

Free estimates

Emergency services offered

"Everything this company did from the initial point of contact to the finalization of the project we were happy me and my wife had a 35ft wide by 20 ft long and bout 4ft deep center pond put in on our property. From the price of the pond it's self to the way they ran there skidsteers they did an amazing job they handle there's self in a professional and great manner the whole time I would these guys every time matter of fact I have them coming out to do siding."
Front of house
Side of house
Front bed
Front house bed with fence and custom brick
Custom 8x8 grill platform

+12

Response time2 days
Recommended by62%of homeowners
Showing 1-10 of 44
Asphalt Driveways questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Yes, with colored finishes and decorative stamping for a personalized touch.

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Brookport, IL homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.