Top-rated rototilling pros.

Get matched with top rototilling pros in Mackay, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Mackay, ID?

Select your specific project to find the pro for you.

Find Rototilling pros in Mackay

Rototilling questions, answered by experts

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Yes, hardscaping features bring value to your landscape, and they can even increase the value of your home. Hardscaping works best alongside professional landscaping. According to a survey by the National Association of Realtors and the National Association of Landscape Professionals, researchers found that hardscape upgrades, landscape upgrades, landscape management, and lawn care services are the top four outdoor projects that add value to a property for resale.

Typically 1-3 days, depending on property size and terrain condition.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Many ways to landscape a steep slope on a budget exist. Avoiding expensive retaining wall construction is the first step. Consider creating a rocky slope with boulders or large stones, or think about planting perennials that return every year with a single investment. Transplanting small trees from elsewhere on your property is also possible and can help to stabilize steep slopes without purchasing new ones. 

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"