Top-rated remodel designers.

Get matched with top remodel designers in Hailey, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your remodel design project in Hailey, ID?

Select your specific project to find the pro for you.

TRUSTED BY HAILEY, ID HOMEOWNERS

  • Average homeowner rating star icon4.9
    Average homeowner rating
  • Verified reviews icon14
    Verified remodel design services reviews

Find Remodel designers in Hailey

Avatar for Re-Bath of Southern Idaho
Re-Bath of Southern Idaho
3.9(
74
)
Bathroom - Remodel

Serving Hailey, ID and surrounding areas

Approved (Corporate)

In business since 1979

Free estimates

Warranties offered

"Curtis and Caleb were great to work with, did a fantastic job on the bathroom remodel, were very courteous, and cleaned up everything when done. Very satisfied with their work."
Corner walk in shower
full bathroom
full bathroom
Bathroom Remodel
Bathroom Remodel

+18

Response time1 day
81 neighbors recently requested a quote
Recommended by66%of homeowners
Avatar for APEX Drafting LLC
APEX Drafting LLC
4.3(
6
)
Designer - Building

Serving Hailey, ID and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

We have a single mission: Complete Customer Satisfaction! We have consistently focused on the needs of our customers, providing personalized attention and a stress-free experience.\nYou will find us to be competitively priced with close attention to the details.\nOur reputation is based on service, safety, and quality, regardless of how large or small the job.\nWe look forward to building a lasting relationship and guarantee your satisfaction!\n

Plan set 1
148 neighbors recently requested a quote
Avatar for Sublime Contracting
Sublime Contracting
4.9(
10
)
Basement - RemodelBathroom - RemodelBathroom - Remodel - For Business+2 more

Serving Hailey, ID and surrounding areas

In business since 2016

Free estimates

"Mr. Heath was fast, punctual, and meticulous. He made sure that I knew about everything that was happening throughout the remodel and the installation. I'm so thankful he talked me out of the tiles I had pick out for my bathroom and into much better ones that ended up being less expensive. He stayed late to finish up early because my mother in-law came in to town a day early. LIFE SAVER!!!"
Complete kitchen remodel
Master Bath Remodel
Accent wall on stairs
Additional Photos
Additional Photos

+5

Response time8 hrs
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Bathroom - RemodelBathroom - Remodel - For BusinessDesigner - Kitchen+3 more

Serving Hailey, ID and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - RemodelBathroom - RemodelBathroom - Remodel - For Business+4 more

Serving Hailey, ID and surrounding areas

In business since 2006

Credit card accepted

"I feel extremely fortunate to have found Vicki through Angie's List !  She is an extremely talented person who is very easy to deal with. She has a breath of knowledge that allows her to accommodate my tastes, but also ensure that the overall design is in sync with the design and location of my home.  She has  a very diplomatic way of suggesting when I'm going astray with my choices and in every case where she has told me "Trust Me"  I have been delighted ! She is very aggressive in helping me find the best pricing and often times will work with the vendors directly  hence saving me the time.  She also has excellent local contacts.  Everyone I've worked with through Vicki has been timely, professional, and highly competent.
My project is far from complete.  I intend to continue to use Vicki and her expert advice until the end !!!!"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Lancey Leon Designs
Lancey Leon Designs
5.0(
6
)
Designer - BuildingDesigner - Kitchen

Serving Hailey, ID and surrounding areas

In business since 2023

Free estimates

Small jobs welcome

"Such a great and professional experience. I was able to give ideas of what I wanted my nursery to look like and receive accurate depictions and pictures of what it would look like as well as other pictures with suggestions of how or if it could be better. I don't have a lot of experience with interior design and so this was extremely helpful! Would absolutely work with Lancey again!!"
Southern Victorian
Southern Victorian
Southern Victorian
Southern Victorian
Southern Victorian

+67

Response time2 days
Recommended by100%of homeowners
...
Showing 1-10 of 55
Remodel Design questions, answered by experts

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

Designs typically take 2-6 months, depending on factoring, project size, and customization needs. Larger or more complex designs may require additional time for approval and revisions.

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

The Hailey, ID homeowners’ guide to remodel design services

From average costs to expert advice, get all the answers you need to get your job done.