"I can't rate the value as that will occur over time. For the work they did -filling the voids under my concrete and the deep hole next to it and my spa, it seems to be a good solution. They also helped me move my spa back. They showed up when they said they would and accomplished the work in less than an hour. It took a minimal amount of communication to get the appointment and a guestimate (with only seeing pictures I sent.). They did raise the price 50% from that but (again) they had not seen the work needed until they arrived."
Quality is our goal! We are a locally owned and operated company that values honesty and integrity, and we stand behind our work. We specialize In Concrete - Injection Leveling - Mud-jacking & Raising & Spray Foam Insulation, offering top of the line experience and material. Our services are customized to the individual project, paying close attention to the details of each project that we are involved with. We look forward to building long-term relationships with our clients and guarantee your satisfaction!
Common issues with concrete that may require professional repair or resurfacing include cracks, spalling, uneven surfaces, and weather damage.
It restores concrete, prevents replacement cost disruptions, reduces trip hazards, and provides stability at a lower cost.
Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.
Many contractors offer warranties for their work. Confirm terms before starting the project.
The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.
The Dubois, ID homeowners’ guide to concrete mudjacking services
From average costs to expert advice, get all the answers you need to get your job done.
DIY mudjacking is an advanced task, but learning how to raise a concrete slab is great to know for many scenarios. Let's take a look at how to DIY mudjack.