Top-rated subcontractors.

Get matched with top subcontractors in Wilton, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Wilton, IA?

Select your specific project to find the pro for you.

TRUSTED BY WILTON, IA HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon107
    Verified subcontracting services reviews

Find Subcontractors in Wilton

Avatar for WBH Improvements
WBH Improvements
5.0(
6
)
Major Home Repairs (General Contractor)

Serving Wilton, IA and surrounding areas

In business since 2021

Free estimates

Credit card accepted

"Installed a 42 inch door with wheelchair threshold to accommodate husband wheelchair easier. Previous door was 36 inches and a tight first for chair. Excellent job. Also installed some towel hangers in bathroom and repaired a drywall damage from a ceiling light taken down. Very pleased with work."
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Recommended by100%of homeowners
Agape Construction & Improvement
4.0(
60
)
Major Home Repairs (General Contractor)

Serving Wilton, IA and surrounding areas

In business since 2009

Free estimates

Emergency services offered

"

Brady is the best you'll ever find for home remodeling projects.
Showed up on time. Took the time to make ever job right.
Projects were worked on over a number of months, one at a time.


The best and most honest tradesmen I've ever found.
We moved to Texas in January of 2014.  We whish Brady could have come with us.
I've found some good (and bad) people to work on the Texas home.  But no one who comes close to the quality of work done by Brady Brower.
"
Additional Photos
Additional Photos
Additional Photos
the home owners are very happy!
all done!!

+1

Recommended by90%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Wilton, IA and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 31
Subcontractors questions, answered by experts

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

Yes, custom designs match existing structural and aesthetic themes.

While concrete walls do not need to "breathe" in the traditional sense of the word, they do require waterproofing and dehumidifying methods, particularly in basements below the water table. Concrete both contains moisture from its initial installation and can absorb water when exposed. Ensuring proper basement ventilation , installing a vapor barrier, and controlling water exposure are all important tasks.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

A split-level home is one that has several staggered floors connected by short staircases, while a split floor plan separates the primary bedroom from the rest of the bedrooms. Split floor plans are most often found in single-story homes, while split-level homes are always at least two stories.

The Wilton, IA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.